Reshoring Signal
Copper semi-finished products: Reshoring Readiness
The Reshoring Readiness Index scores copper semi-finished products at 65.5 of 100 (building case), with a 45.3% observed effective calculated-duty rate.
The short answer
- Copper semi-finished products has an RRI of 65.5 of 100, a building case: the observed effective calculated-duty rate is 45.3% (tariff term 100/100), U.S. exports cover 41% of imports (dependence 59/100), and the named-source concentration floor is 1070 HHI (11/100). The score is flat 0.0 points over the past year.
The three terms behind the score
- Tariff pressure 100/100 (45% weight): a 45.3% observed effective calculated-duty rate, level 100/100 with a one-year trend of 100/100.
- Import dependence 59/100 (30% weight): U.S. exports cover about 41% of imports.
- Sourcing concentration 11/100 (25% weight): 1070 on the complete-board Herfindahl index.
Frequently asked questions
- What is the reshoring readiness score for copper semi-finished products? 65.5 of 100 as of the latest month, a building case. The score combines tariff pressure (100/100), import dependence (59/100), and sourcing concentration (11/100) under the published RRI v2.0.0 methodology.
- Why does copper semi-finished products score this way? The observed effective calculated-duty rate is 45.3% in this family, U.S. exports cover about 41% of what it imports, and its retained-source Herfindahl index is 1070. Under this screening formula, a higher observed rate, deeper import dependence, and more concentrated sourcing raise the score; they do not establish plant-level profitability.
- Does a high score mean reshoring is profitable? No. The RRI is a screening indicator: it says the public trade data points that way, not that any specific plant pencils out. Validate with your own landed-cost, labor, and capacity numbers before deciding.
About this data
- A transparent screening indicator built from public USITC trade data, not sourcing advice. The tariff term uses an observed effective calculated-duty rate, not an entry-specific legal rate or cash-paid amount. Concentration is matched to the month's calendar year (latest completed year for newer months); import dependence is currently a latest-year snapshot applied across the series and will deepen into a true history as export years accumulate. The named-top-sources HHI is a floor. Validate any decision with your own landed-cost and capacity numbers.
Last reviewed 2026-10-08.