MFG Calcs Signals
MFN-Free and Reciprocal-Preference HTS Line Coverage
Unweighted HTS line coverage by manufacturing family: General-column MFN Free rates, potential reciprocal-preference Free rates, and Chapter 99 references.
What this Signal shows
- See unweighted MFN-Free and potential reciprocal-preference statutory line coverage without treating Chapter 99 references as proof of final duty.
Cadence, source and downloads
- Cadence: With each USITC HTS revision, refreshed automatically.
- From USITC HTS General and Special rate fields plus Chapter 99 references. Program eligibility and Chapter 99 applicability depend on entry facts. Reference data, not a customs ruling. Full method at /signals/duty-free-routes.
- Free to download as Board (CSV), Full board (JSON), Methodology (JSON) under CC BY 4.0.
Last reviewed 2026-10-01.