MFG Calcs Signals
How Accurate Are Our Forecasts?
The self-graded track record of our forecaster: out-of-sample error across every published forecast's backtest, directional hit rate, and accuracy by category.
What this Signal shows
- See how accurate the MFG Calcs manufacturing forecasts have actually been: aggregate backtest error and directional hit rate across every series.
Cadence, source and downloads
- Cadence: Refreshed automatically whenever the forecasts update.
- Self-graded from the same walk-forward backtests the forecast pages render. One-step-ahead out-of-sample; error compounds with horizon. Full ledger at /signals/forecast-accuracy.
- Free to download as By category (CSV), Full ledger (JSON), Methodology (JSON) under CC BY 4.0.
Last reviewed 2026-10-01.