Tariff monitor · Machinery & Equipment
Foundry and Rolling Equipment: Statutory & Effective Tariff Rates
USITC Column 1 General rates for 10 foundry and rolling equipment HTS lines (parseable range 0%). Effective rate Aug 2026: 11.93%; monthly history since 2014.
The short answer
- The observed effective calculated-duty rate on U.S. imports of foundry and rolling equipment was 11.93% in Aug 2026, down from 12.88% a year earlier — USITC Calculated Duties divided by covered customs value. The Column 1 General line-rate range is 0% across 10 HTS lines in the 2026 schedule; individual lines are called “Free” only when the official General field is literally Free, which still does not determine a shipment’s final duty. Italy is the largest source, holding 16.7% of 2025 imports.
Statutory rates from the schedule
- Converters, ladles, casting machines, and rolling mills — the heavy capital behind primary metal and foundry work. This family covers HTS headings 8454, 8455: 10 eight-digit rate lines with a parseable Column 1 General range of 0% in the 2026 schedule. “Free” means the official General field is literally Free for that line; it does not determine final entry liability.
- Chapter 99 references on individual lines (for example, 9903.90.08) identify provisions to review; applicability and any additional duty depend on the entry facts.
Observed calculated-duty data
- Latest month on record (2026-08): 11.93% effective on $100.4M of imports, versus 12.88% in the same month a year earlier. The monthly archive holds 152 observations from 2014-01 through 2026-08.
- In 2025, U.S. imports for consumption in this family totaled $1.4B in customs value, with $128.6M in USITC reported calculated duty on $1.4B of covered customs value: an effective calculated-duty rate of 9.04%. The aggregate reflects the recorded entry mix but does not attribute the result to a specific legal provision.
- A year earlier the effective calculated-duty rate was 1.36%, so the observed rate rose 7.7 points.
- Top source countries in 2025: Italy ($237.7M at 6.03%), Germany ($187.5M at 7.72%), Japan ($148.3M at 7.66%), Canada ($138.0M at 2.19%), China ($127.2M at 34.89%).
- Reported freight and insurance equaled 3.48% of covered customs value in 2025 ($49.6M total), from USITC DataWeb. It is shown alongside the effective calculated-duty rate and is not part of the customs-value duty base.
- For scale, 2025 imports in this family equal 0.5% of the U.S. primary metals industry's $284B gross output (2025, BEA).
Representative rate lines
- 8454.10.00.00: Converters · MFN Free
- 8454.20.00: Ingot molds and ladles · MFN Free
- 8454.30.00: Casting machines · MFN Free
- 8454.90.00: Parts · MFN Free
- 8455.10.00.00: Tube mills · MFN Free
- 8455.21.00.00: Hot or combination hot and cold · MFN Free
- 8455.22.00.00: Cold · MFN Free
- 8455.30.00: Rolls for rolling mills · MFN Free
Frequently asked questions
- What is the U.S. tariff rate on foundry and rolling equipment? USITC calculated duties imply an effective rate of 11.93% in Aug 2026 (calculated duties ÷ covered customs value, USITC DataWeb). The parseable Column 1 General line-rate range is 0%; individual lines are called “Free” only when the official General field is literally Free, and product, origin, preference and tariff mix can contribute to the observed-rate difference.
- What are the statutory MFN line rates for foundry and rolling equipment? The parseable Column 1 General line-rate range is 0% across the family's 10 eight-digit HTS lines in the 2026 Harmonized Tariff Schedule (headings 8454, 8455). “Free” means the official General field is literally Free for a line; it does not determine final entry liability.
- Which countries supply the most foundry and rolling equipment to the U.S.? Top retained sources in 2025: Italy ($237.7M at 6.03%), Germany ($187.5M at 7.72%), Japan ($148.3M at 7.66%). Italy holds 16.7% of total family import customs value. Retained sources cover 82.2%; their HHI is 850, a lower bound whose floor falls in the diversified range without classifying the omitted tail.
- How much foundry and rolling equipment does the U.S. import? $1.4B of customs value in 2025, with $128.6M in USITC Calculated Duties — an effective calculated-duty rate of 9.04%.
- Is the U.S. a net importer of foundry and rolling equipment? Yes — a net importer in 2025: $1.4B imported vs $294.8M exported (exports are 21% of imports).
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-08.