Tariff monitor · Machinery & Equipment

Pumps for Liquids: Statutory & Effective Tariff Rates

USITC Column 1 General rates for 16 pumps for liquids HTS lines (parseable range 0%–2.5%). Effective rate Aug 2026: 12.55%; monthly history since 2014.

The short answer

  • The observed effective calculated-duty rate on U.S. imports of pumps for liquids was 12.55% in Aug 2026, down from 17.27% a year earlier — USITC Calculated Duties divided by covered customs value. The Column 1 General line-rate range is 0%–2.5% across 16 HTS lines in the 2026 schedule; individual lines are called “Free” only when the official General field is literally Free, which still does not determine a shipment’s final duty. Mexico is the largest source, holding 21.4% of 2025 imports.

Statutory rates from the schedule

  • Process, hydraulic, and transfer pumps and their parts. This family covers HTS heading 8413: 16 eight-digit rate lines with a parseable Column 1 General range of 0%–2.5% in the 2026 schedule. “Free” means the official General field is literally Free for that line; it does not determine final entry liability.

Observed calculated-duty data

  • Latest month on record (2026-08): 12.55% effective on $1.2B of imports, versus 17.27% in the same month a year earlier. The monthly archive holds 152 observations from 2014-01 through 2026-08.
  • In 2025, U.S. imports for consumption in this family totaled $12.5B in customs value, with $1.8B in USITC reported calculated duty on $12.5B of covered customs value: an effective calculated-duty rate of 14.22%. The aggregate reflects the recorded entry mix but does not attribute the result to a specific legal provision.
  • A year earlier the effective calculated-duty rate was 3.36%, so the observed rate rose 10.9 points.
  • Top source countries in 2025: Mexico ($2.7B at 7.17%), China ($1.7B at 46.36%), Germany ($1.4B at 10.36%), Japan ($1.4B at 9.79%), Canada ($1.0B at 4.3%).
  • Reported freight and insurance equaled 2.45% of covered customs value in 2025 ($307.2M total), from USITC DataWeb. It is shown alongside the effective calculated-duty rate and is not part of the customs-value duty base.

Representative rate lines

  • 8413.11.00.00: Pumps for dispensing fuel or lubricants, of the type used in filling-stations or in garage · MFN Free
  • 8413.19.00.00: Other · MFN Free
  • 8413.20.00.00: Hand pumps, other than those of subheading 8413.11 or 8413.19 · MFN Free
  • 8413.30.10.00: Fuel-injection pumps for compression-ignition engines · MFN 2.5%
  • 8413.30.90: Other · MFN 2.5%
  • 8413.40.00.00: Concrete pumps · MFN Free
  • 8413.50.00: Other reciprocating positive displacement pumps · MFN Free
  • 8413.60.00: Other rotary positive displacement pumps · MFN Free

Frequently asked questions

  • What is the U.S. tariff rate on pumps for liquids? USITC calculated duties imply an effective rate of 12.55% in Aug 2026 (calculated duties ÷ covered customs value, USITC DataWeb). The parseable Column 1 General line-rate range is 0%–2.5%; individual lines are called “Free” only when the official General field is literally Free, and product, origin, preference and tariff mix can contribute to the observed-rate difference.
  • What are the statutory MFN line rates for pumps for liquids? The parseable Column 1 General line-rate range is 0%–2.5% across the family's 16 eight-digit HTS lines in the 2026 Harmonized Tariff Schedule (headings 8413). “Free” means the official General field is literally Free for a line; it does not determine final entry liability.
  • Which countries supply the most pumps for liquids to the U.S.? Top retained sources in 2025: Mexico ($2.7B at 7.17%), China ($1.7B at 46.36%), Germany ($1.4B at 10.36%). Mexico holds 21.4% of total family import customs value. Retained sources cover 81.1%; their HHI is 1000, a lower bound whose floor falls in the diversified range without classifying the omitted tail.
  • How much pumps for liquids does the U.S. import? $12.5B of customs value in 2025, with $1.8B in USITC Calculated Duties — an effective calculated-duty rate of 14.22%.
  • Is the U.S. a net importer of pumps for liquids? Yes — a net importer in 2025: $12.5B imported vs $6.6B exported (exports are 53% of imports).

About this data

  • Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.

Last reviewed 2026-10-08.