Production and Throughput
Aluminum Extrusion Press Log Excel Template
Log every die run and see billet recovery, where the billet goes (butt, ends, saw offcuts and defects) and accepted output per press hour, by press, die and week.
Free, and a plain .xlsx with no macros to enable. A CSV with live formulas and a printed how-to guide come with it.
Overview
This aluminum extrusion log is a working Excel workbook for extrusion plant managers, press supervisors, die shop and quality engineers and cost accountants. It ships with six weeks of example die runs for a fictional extruder with three presses and eight dies, so the dashboard and charts are populated the moment you open it; replace the example rows with your own and everything recalculates.
Each row is one die run. You type the billets pushed and their weight, the good profile packed and the scrap you weighed, split into butt, ends and stretcher grips, saw offcuts and defect scrap, plus the elapsed press hours. The workbook works out billet recovery the same way the Aluminum Billet Yield calculator on this site does, and acceptance and the accepted output rate the same way its Extrusion Press Output Rate calculator does, and shows how much billet nobody accounted for. Every roll-up adds weights and hours before it divides, so the recovery of a press, a die or a week is never an average of percentages, and the required rate for a mix of presses is weighted by their hours.
In practice, log each run when it is packed and review the dashboard weekly. Billet losses by press show where the metal goes; billet not recovered by die shows which dies miss what your target allows; and accepted rate by press shows which presses keep up with their required output.
What this template includes
- Press Log table: one row per die run with billets, billet input, good profile, butt, ends, saw offcuts, defect scrap, the main defect and press hours
- Per-run recovery, gap to your target in points, non-good billet, profile extruded, acceptance, accepted output rate and the margin to the press's required rate, with a status word
- Unaccounted billet: billet input less good profile and every scrap you weighed, so missing metal shows up instead of hiding in the yield
- Check column that names problems in words: good profile plus scrap heavier than the billet, defect scrap with no defect type, a press or die not on the Setup lists, duplicate run numbers
- Dashboard with press, die and date filters and eight KPI tiles, including billet recovery against your target, accepted rate against the hours-weighted required rate and the lowest-recovery die
- Four native charts: billet not recovered by week and by die against what your target allows, billet losses by press split into butt, ends, saw offcuts, defects and unaccounted, and accepted rate by press against its required rate
- Method sheet with every formula, a Verify sheet that re-checks them against an independent reference (Self-check: PASS), and an About MFG Calcs sheet linking the live calculator and every free tool on the site
Suggested use case
Use it to see which dies and presses lose the most billet and to what, to show whether a press is keeping up with its required output, or to back a die correction or a billet-length change with the numbers.
How to use it
- On Setup, choose kg or lb and your recovery target, then replace the example presses (with each one's required output rate), dies and defect types.
- On Press Log, add one row per die run: billets, billet input, good profile, butt, ends, saw offcuts, defect scrap and press hours.
- Fix anything the Check column flags, such as good profile plus scrap weighing more than the billet input.
- Open the Dashboard and filter by press, die or dates to review one press, one die or one week.
- Use billet losses by press and billet not recovered by die to decide what to work on first: butt length, cut lengths, die corrections or defects.
Frequently Asked Questions
- How is billet recovery calculated?
- Billet recovery is good profile divided by billet input. A lot that used 10,000 lb of billet and packed 8,650 lb of good profile has an 86.5 percent recovery and 1,350 lb of non-good billet. Against an 88 percent target it is 1.5 points short, the same answer as the Aluminum Billet Yield calculator.
- What is the difference between recovery and acceptance?
- Recovery divides good profile by the billet input; acceptance divides it by the profile that actually left the press, which is the billet input less the butt. A run that pushed 19,100 lb of billet with a 600 lb butt extruded 18,500 lb; if 18,000 lb was packed as good, acceptance is 97.3 percent and recovery 94.2 percent.
- How is the accepted output rate worked out?
- Good profile divided by the elapsed press hours, stops included. 18,000 lb packed from an 8-hour run is 2,250 lb an hour; against 2,300 lb an hour required, the press is 50 lb an hour short, the same answer as the Extrusion Press Output Rate calculator. When the dashboard adds presses together it weights their required rates by hours: 10 hours on a press that needs 1,000 kg an hour and 6 hours on one that needs 1,600 make a required rate of 1,225 kg an hour.
- What is unaccounted billet?
- Billet input less good profile less every scrap you weighed: metal left in the die when it comes off the press, weighing differences and scrap that went into a bin unweighed. A run of 10,000 kg of billet with 8,650 kg of good profile and 1,230 kg of weighed scrap has 120 kg, or 1.2 percent, unaccounted. If it grows, check the scales and the scrap bins before the process.
- What recovery target should we set?
- Set your own on the Setup sheet; the workbook does not assume an industry benchmark. Recovery depends on the product mix: short cut lengths and complex profiles such as heat sinks lose more to saw offcuts and ends than long, simple profiles, so start from your own recent history. With a 90 percent target, a week at 89.5 percent shows Near target and one at 88 percent shows Below target.