Batch Yield and Loss Tracker Excel Template
Log every batch's input, good output and off-spec and see yield, process loss and the shortfall to each product's target, by product, vessel and week.
Free, and a plain .xlsx with no macros to enable. A CSV with live formulas and a printed how-to guide come with it.
Overview
This batch yield tracker is a working Excel workbook for production managers, process engineers and plant managers in chemicals, coatings, adhesives, food and other batch plants. It ships with six weeks of example data for a fictional resin and adhesives plant with four vessels and six products, so the dashboard and charts are populated the moment you open it; replace the example rows with your own and everything recalculates.
Each row is one completed batch. You type the mass charged, the mass released as good product and any off-spec you weighed and set aside, and pick the main loss category. The workbook calculates yield, process loss, the unaccounted part of the loss, the good output the product's target asks for and the shortfall to it, with the same formulas the Batch Yield calculator on this site uses for one batch, and puts a value on the loss from the material value you set. Every roll-up adds masses before it divides, so the yield of a product, a vessel or a week is never an average of percentages, and it is compared with the input-weighted target of the same batches.
In practice, log each batch when it is released and review the dashboard weekly. Loss by product shows which products miss what their targets allow; loss by vessel separates weighed off-spec from the unaccounted rest (hold-up, filtration, spills, evaporation); and the loss-category Pareto tells you which of those to work on first.
What this template includes
- Batch Log table: one row per completed batch with batch input, good released, weighed off-spec and the main loss category
- Per-batch yield, process loss, unaccounted loss, target good output, shortfall to target and gap in points, with a status word against the product's own target yield
- An estimate of what each batch's lost material was worth, from a material value per unit of input that you set for each product
- Check column that names problems in words: more good output than input, off-spec larger than the loss, input above the vessel's capacity, a product or vessel not on the Setup lists, duplicate batch numbers
- Dashboard with product, vessel and date filters and eight KPI tiles, including batch yield against the input-weighted target and the product furthest below its target
- Four native charts: process loss by week and by product against what the targets allow, loss by vessel split into off-spec and unaccounted loss, and a loss-category Pareto
- Method sheet with every formula, a Verify sheet that re-checks them against an independent reference (Self-check: PASS), and an About MFG Calcs sheet linking the live calculator and every free tool on the site
Suggested use case
Use it to see which products, vessels and weeks lose material and where it goes, to put a value on process loss, or to report yield against target in a weekly production or cost review.
How to use it
- On Setup, enter your plant name, currency and mass unit, then replace the example products (with their target yields and material values), vessels and loss categories.
- On Batch Log, add one row per completed batch: batch input, good released, any off-spec set aside and the main loss category.
- Fix anything the Check column flags, such as more good output than input or a batch above its vessel's capacity.
- Open the Dashboard and filter by product, vessel or dates to review one product, one vessel or one week.
- Use the loss-category Pareto and the loss-by-vessel chart to decide where to look first: hold-up, filtration, off-spec or spills.
Frequently Asked Questions
- How is batch yield calculated?
- Batch yield is good released output divided by total batch input. A batch charged with 12,000 lb that released 11,650 lb of good product has a 97.08 percent yield and 350 lb of process loss. Against a 98 percent target the batch should have released 11,760 lb, so it is 110 lb short and 0.92 points below target, the same answer as the Batch Yield calculator.
- What should count as batch input?
- Everything charged to the batch as actually weighed or metered: raw materials, solvents, water and any rework blended in, in the same unit you weigh the good product in. If you charge by recipe quantity rather than by weight, yields are only as good as the recipe's accuracy, so weigh what you can.
- What is the difference between off-spec and unaccounted loss?
- Off-spec is product you weighed and set aside because it failed a specification, to rework or scrap. Unaccounted loss is the rest of the process loss that nobody weighed: hold-up in the vessel and lines, filter cake, spills, samples and evaporation. A batch with 400 kg of process loss and 240 kg of off-spec has 160 kg unaccounted.
- How does the workbook compare yields of products with different targets?
- Each product has its own target yield on the Setup list. When the dashboard adds batches of several products, the target is weighted by batch input: 12,000 kg at a 98 percent target and 5,000 kg at 97 percent give a weighted target of about 97.7 percent. Charts show loss as a share of input against the loss the targets allow, so every product is read on the same scale.
- What target yield should we set?
- Set your own for each product on the Setup sheet; the workbook does not assume an industry benchmark. Many plants start from the yield the recipe should give after unavoidable losses such as samples and hold-up, then tighten it as losses fall. With a 98 percent target, a 97.08 percent batch shows Near target and a 95 percent batch shows Below target.