Blow Molding Cost per Bottle Estimator Excel Template
Estimate a blow molded bottle's cost from resin, flash and regrind, cavities and cycle time, setup and mould, and price five order quantities per 1,000 bottles.
Free, and a plain .xlsx with no macros to enable. A CSV with live formulas and a printed how-to guide come with it.
Overview
This blow molding cost estimator is a working Excel workbook for blow molding estimators, sales and plant managers, and packaging buyers. It ships with a worked quote for a 1-litre HDPE detergent bottle from a fictional extrusion blow molder, so every block, chart and price is filled in the moment you open it; overwrite the yellow cells with your bottle and everything recalculates.
The material block turns bottle weight, flash and regrind into the material each bottle really uses, at a blended price of resin and colourant. The machine block turns cavities, cycle time and a sampled acceptance into good bottles per hour, the same way the Cavitation Output calculator on this site does, and the machine rate plus crew into a cost per bottle. Setup, purge, handling, packaging, mould amortisation and overhead are added, and the cost per bottle is the Unit Manufacturing Cost calculator's total cost over the accepted bottles.
Five order quantities show how setup and handling spread out as orders grow, with the price per 1,000 rounded to your step and the material to order. The Dashboard picks one quantity for a summary you can send: price, cost, margin against your target and where the cost of a bottle goes.
What this template includes
- Material block: bottle weight, flash trimmed and the share reground, colourant let-down and masterbatch price, with the blended price and the material each bottle made uses
- Machine block: cavities, cycle time and a sampled acceptance give gross and good bottles per hour; the machine rate plus crew give the cost per bottle made
- Order block: setup hours, purge material and handling per order, packaging per 1,000 bottles and mould amortisation over the mould's life
- Five order quantities: bottles to make, machine hours, every cost line per bottle, cost and price per 1,000 rounded to your step, margin, material to order and grams per accepted bottle
- Dashboard for the quantity you pick: price per 1,000, cost per bottle, margin against your target and good output, a price-and-cost chart, a cost-split chart and the cost build-up
- Material and machine checks in words: a resin or machine not on the Setup lists, a missing bottle weight, more accepted bottles than inspected
- Method sheet with every formula, a Verify sheet that re-checks them against an independent reference (Self-check: PASS), and an About MFG Calcs sheet linking the live calculator and every free tool on the site
Suggested use case
Use it to quote a new bottle at several order quantities, to see what a lighter bottle, more regrind or a faster cycle is worth per 1,000, or to check a supplier's bottle price against the cost behind it.
How to use it
- On Setup, enter your company, currency, labour rate, overhead, target margin and price step, then your resins (price per kg) and machines (rate per hour without crew).
- On Bottle Estimate, choose the resin and enter the bottle weight, the flash per bottle, the share of flash you regrind and the colourant let-down.
- Choose the machine and enter the active cavities, the cycle time, a sample of accepted and inspected bottles and the operators per machine.
- Enter setup hours, purge material and handling per order, packaging per 1,000 and the mould's cost, share and life, then type five order quantities.
- Read cost and price per 1,000 and the margin for each quantity, and open the Dashboard to pick one and see where the cost goes.
Frequently Asked Questions
- How does the workbook work out the cost per bottle?
- Material first: a 42 g bottle with 14 g of flash, 95 percent of it reground, uses 42.7 g per bottle made; at a blended 1.517 per kg (98 percent HDPE at 1.45 and 2 percent masterbatch at 4.80) that is 0.0648 per bottle made. Four cavities at a 14-second cycle make 1,028.6 bottles an hour, and a 68.00 machine with half an operator at 32.00 costs 84.00 an hour, or 0.0817 per bottle made. Spread over the 98.5 percent accepted, with packaging, setup, mould and overhead added, 50,000 bottles cost 188.90 per 1,000 and price at 230.50 per 1,000 for an 18 percent margin.
- How do flash and regrind change the material cost?
- Extrusion blow molding trims flash from every bottle, and only the flash you do not reuse is lost. With 14 g of flash and 95 percent reground, a 42 g bottle uses 42.7 g of material; with no regrind it would use the whole 56 g shot, 31 percent more.
- How are good bottles per hour worked out?
- Cycles per hour are 3,600 divided by the cycle time in seconds, gross output is that times the active cavities, and good output is gross output times the share of a sample that passed inspection. Four cavities at a 4-second cycle make 3,600 bottles an hour; with 980 of 1,000 sampled bottles accepted that is 3,528 good bottles an hour, the same answer as the Cavitation Output calculator.
- Why is the price per 1,000 lower for bigger orders?
- Setup, purge and material handling are charged once per order. In the example they come to 409.93 per order (3 setup hours at 84.00, 25 kg of purge material and 120.00 of handling), which is 40.99 per 1,000 bottles on an order of 10,000 but 1.64 on 250,000, so the price falls from 274.50 to 222.00 per 1,000.
- Can I use it for stretch blow molded PET bottles?
- Yes. For single-stage injection stretch blow molding, set the flash to zero, choose the PET resin and your machine. For two-stage reheat stretch blow molding with bought-in preforms, enter the preform's cost per kg (its price divided by its weight) as the resin price, so the material line is the preform cost.