Manufacturing Cost and Quoting
Galvanizing Cost Log Excel Template
Log every load you send for hot-dip galvanizing and see cost per pound, minimum charges, extras and invoice differences by job, galvanizer and week.
Free, and a plain .xlsx with no macros to enable. A CSV with live formulas and a printed how-to guide come with it.
Overview
This galvanizing cost log is a working Excel workbook for fabrication shop owners, purchasing, cost accountants and project managers who send steel out for hot-dip galvanizing and recharge it to jobs. It ships with twelve weeks of example loads from a fictional steel fabricator to two galvanizers, so the dashboard and charts are populated the moment you open it; replace the example rows with your own and everything recalculates.
Each row is one load: the weight you shipped, the chargeable weight the galvanizer billed, and the rate, minimum charge and extras that apply. The workbook prices it the same way the Galvanizing Cost calculator on this site does: the weight charge is the chargeable weight times the rate, the galvanizer's minimum charge applies when the weight charge falls below it, and extras such as setup, handling or rush are added on top. When the invoice arrives, it is compared with that cost and flagged if it differs by more than your tolerance.
In practice, log each load when it ships and type the invoice when it arrives. The dashboard shows cost per pound by job for recharging, how much small loads cost in minimum charges, what extras add, which invoices to query, and how the weight billed compares with the black weight you sent.
What this template includes
- Galvanizing Log table: one row per load with the date shipped, galvanizer, weigh ticket, job, black weight, chargeable weight billed, a quoted rate when the load had its own, extras and the invoiced amount
- Per-load weight charge, minimum charge top-up, processing charge (the greater of the two), total cost, all-in cost per pound and weight gain from black to billed weight
- Invoice check against the calculated cost, with a status of Matches, Query invoice or Awaiting invoice and a tolerance you set
- Check column that names problems in words: a galvanizer or job not on the Setup lists, chargeable weight below the black weight, an invoice that differs from the quote
- Dashboard with galvanizer, job and date filters and eight KPI tiles: total cost, cost per pound, chargeable weight, loads, minimum top-ups, extras, invoice variance and weight gain
- Two native charts, cost by week split into weight charges, minimum top-ups and extras, and cost by job, plus by-galvanizer, by-job and weekly tables
- Method sheet with every formula, a Verify sheet that re-checks them against an independent reference (Self-check: PASS), and an About MFG Calcs sheet linking the live calculator and every free tool on the site
Suggested use case
Use it to recharge galvanizing to jobs at the right cost per pound, to see what small loads cost in minimum charges, to check galvanizer invoices against the quote, or to compare galvanizers.
How to use it
- On Setup, enter your company name, currency and invoice tolerance, then your galvanizers with their quoted rate per pound and minimum charge, and your jobs.
- On Galvanizing Log, add one row per load: date shipped, galvanizer, ticket, job, black weight and the chargeable weight the galvanizer billed.
- Type a quoted rate only when a load was quoted at its own rate, any extras billed on top, and the invoiced amount when the invoice arrives.
- Query any invoice the Invoice column flags, and fix anything the Check column names.
- On the Dashboard, filter by galvanizer, job or dates to see cost per pound, minimum top-ups and the cost to recharge to each job.
Frequently Asked Questions
- How is the cost of a galvanizing load calculated?
- Multiply the chargeable weight by the rate per pound, use the galvanizer's minimum charge instead if it is higher, and add any extras. In the Galvanizing Cost calculator's example, 40,000 lb at 0.09 per lb is 3,600.00, above a 3,000.00 minimum, plus 300.00 of setup and handling: 3,900.00, or 0.0975 per lb.
- What does a minimum charge do to a small load?
- It sets a floor under the processing charge. In the example, a 780 lb load at 0.49 per lb comes to 382.20, below the galvanizer's 400.00 minimum, so the minimum adds 17.80 and the load costs 400.00, or 0.5128 per lb instead of 0.49. The Minimum top-up column and tile show what small loads cost you, so you can combine them.
- How do I check a galvanizing invoice?
- Type the invoiced amount on the load's row. The workbook compares it with the cost from the quoted rate, minimum and extras and reads Matches within your tolerance or Query invoice beyond it. In the example, one load of 5,540 lb was invoiced at 0.52 per lb against a 0.49 quote, 166.20 more than the quote gives.
- What weight do galvanizers charge on?
- Many bill on the weight after galvanizing, weighed on their scale; some bill on black weight plus an allowance. Type the weight on the invoice as the chargeable weight and your own shipped weight as the black weight. The workbook shows the difference as a weight gain for each load and overall, so a change in how a galvanizer weighs stands out.
- How do I recharge galvanizing to a job?
- Pick the job on each load. The By job table and chart add the total cost, chargeable weight and cost per pound of every load on the job, and the job filter narrows the whole Dashboard to it. Add the job's freight to and from the galvanizer as an extra if you recharge that too.