Industry Cost Kits
Heat Treat Load and Cost Log Excel Template
Log every furnace load and see what it costs per part and per kg, how full each furnace runs, how many parts are rejected and, for commercial work, each lot's price and margin.
Free, and a plain .xlsx with no macros to enable. A CSV with live formulas and a printed how-to guide come with it.
Overview
This heat treat cost log is a working Excel workbook for heat treat managers, commercial heat treaters, metallurgists and cost accountants. It ships with six weeks of example loads for a fictional commercial heat treater with five furnaces and six processes, so the dashboard and charts are populated the moment you open it; replace the example rows with your own and everything recalculates.
Each row is one furnace load. You type the parts and their weight, the hours the load held the furnace, the energy and gas it used, the labour hours and any parts rejected. The workbook costs the load from your rates: furnace hours times the furnace's hourly rate, energy and gas at your prices and labour at your loaded rate. For commercial work it prices the lot from your price list the same way the Heat Treat Cost per Part calculator on this site does, the larger of parts times the rate and the minimum charge, plus the batch fee, and sets that against the load's cost to give the margin. Every roll-up adds money, weight and hours first and divides last, so the cost per kg of a furnace or a week is never an average of averages.
In practice, log each load when it comes out of the furnace and review the dashboard weekly. Margin by process shows which work is priced below your target; load fill by furnace shows which furnaces run half empty, the usual reason one furnace costs more per kg than another; and the weekly table shows revenue, cost and rejects side by side.
What this template includes
- Load Log table: one row per furnace load with parts, load weight, furnace hours, energy, gas, labour hours and parts rejected
- Per-load furnace, utility and labour cost, load cost, cost per good part and per unit of load weight, load fill against the furnace's maximum load and the reject rate
- Lot price from your process price list, the larger of parts x rate and the minimum charge plus the batch fee, with margin, margin % and a status word against your margin target
- Check column that names problems in words: more parts rejected than in the load, a load above the furnace's maximum, a furnace or process not on the Setup lists, duplicate load numbers
- Dashboard with furnace, process and date filters and eight KPI tiles, including cost per kg, margin and load fill against your targets and the lowest-margin process
- Four native charts: margin by process and load fill by furnace against your targets, cost per unit of load weight by furnace split into furnace, utility and labour cost, and revenue against load cost by week
- Method sheet with every formula, a Verify sheet that re-checks them against an independent reference (Self-check: PASS), and an About MFG Calcs sheet linking the live calculator and every free tool on the site
Suggested use case
Use it to see what each furnace load really costs, to find furnaces run half empty and processes priced below your margin target, or to back up a price increase or a minimum lot charge with the numbers behind it.
How to use it
- On Setup, enter your plant name, currency, mass and gas units, loaded labour rate and electricity and gas prices, then replace the example furnaces (with their maximum loads and hourly rates) and processes.
- For commercial heat treating, give each process its price per part, minimum charge and batch fee; for in-house work, leave them blank.
- On Load Log, add one row per furnace load: parts, load weight, furnace hours, energy, gas, labour hours and parts rejected.
- Fix anything the Check column flags, then open the Dashboard and filter by furnace, process or dates.
- Use margin by process to find work priced below your target, and load fill by furnace to find furnaces run half empty.
Frequently Asked Questions
- How does the workbook price a heat treat lot?
- The lot price is the larger of parts times the rate per part and the process's minimum charge, plus its batch fee. 500 parts at 2.75 is 1,375.00, above a 1,000.00 minimum, so with a 250.00 batch fee the lot is 1,625.00, or 3.25 per part, the same answer as the Heat Treat Cost per Part calculator. A lot of 200 parts is only 550.00 at the rate, so the minimum applies: 1,000.00 plus 250.00 is 1,250.00, or 6.25 per part.
- How is the cost of a furnace load calculated?
- Furnace hours times the furnace's hourly rate, plus energy and gas at your prices, plus labour hours at your loaded rate. A 9.5-hour carburizing load in a furnace costed at 41.00 an hour is 389.50; 1,100 kWh at 0.12 and 60 m3 of gas at 0.45 add 159.00; 2 labour hours at 38.00 add 76.00, for a load cost of 624.50. With 160 parts and 2 rejected that is 3.95 per good part, and at 480 kg it is 1.30 per kg. Priced at 5.60 a part with a 60.00 batch fee, the lot is 956.00 and the margin 331.50, or 34.7 percent.
- Why does load fill matter so much?
- A load takes nearly the same furnace time and labour whether the furnace is full or half empty, so cost per kg falls as the load gets heavier. A load that costs 620.00 is 1.38 per kg at 450 kg and 0.69 per kg at 900 kg; energy rises somewhat with the mass heated, so the real saving is a little less than half. Load fill is load weight divided by the furnace's maximum load, compared with the fill target you set on Setup.
- What should a furnace's hourly rate include?
- Everything that furnace costs except the energy, gas and labour you log per load: depreciation, maintenance and refractory, baskets and fixtures, the atmosphere generator, floor space and overhead, spread over the hours the furnace actually runs. A furnace that costs 180,000 a year to own and keep, over 4,400 run hours, is 40.91 an hour. The Machine Hour Rate template on this site builds that rate step by step.
- Can I use it for in-house heat treating with no price list?
- Yes. Leave the rate per part, minimum charge and batch fee blank for in-house processes. Their loads still show cost per part, cost per kg, load fill and the reject rate, but no lot price or margin, and the Dashboard's margin figures cover priced loads only. A plant that does both can price its commercial processes and leave its own work blank.