Safety and People

NIOSH Lifting Equation Job Analysis Excel Template

Assess every two-handed lifting task with the revised NIOSH lifting equation: the recommended weight limit from the CCOHS tables, the load against it, and the factor to change first.

Free, and a plain .xlsx with no macros to enable. A CSV with live formulas and a printed how-to guide come with it.

Overview

This NIOSH lifting equation job analysis is a working Excel workbook for EHS managers, ergonomists, safety coordinators and engineers who assess manual lifting. It ships with twelve example lifting tasks at a fictional food plant, so the limits, charts and tables are populated the moment you open it; replace the example rows with your own measurements and everything recalculates.

The revised NIOSH lifting equation gives a recommended weight limit for a two-handed lift: a load constant of 23 kg multiplied by six factors for the horizontal reach, the starting height of the hands, the vertical travel, the twist, the frequency and duration of lifting, and the grip. Each factor is 1.00 or close to it in ideal conditions (the CCOHS height table peaks at 0.99) and smaller as the lift gets harder. The workbook reads every factor from the tables published by the Canadian Centre for Occupational Health and Safety (CCOHS), on a straight line between table rows, exactly as the Ergonomic Risk Score calculator on this site does, and the build checks it against that calculator.

Each task shows its recommended weight limit, the load as a share of it and the multiplier that limits the lift most. CCOHS's advice when the limit is lower than the load is to find the factor contributing the highest risk, the lowest multiplier, and change the lift; the dashboard counts how many tasks each factor limits, so you can see whether reach, height, frequency or grip is the plant's main problem.

What this template includes

Suggested use case

Use it to assess the manual lifting in a plant or warehouse, to rank tasks for redesign by how far the load is over the recommended limit, and to show which change (reach, height, frequency, grip) would help most.

How to use it

  1. On Setup, enter your site name and who assessed the tasks, choose kg and cm or lb and inches, and list your areas; leave the CCOHS tables as published.
  2. On Lifting Tasks, add one row per lift and measure at the start of the lift: the load, the horizontal distance of the hands from the midpoint between the ankles, the hand height, the vertical travel and the twist.
  3. Choose the time between lifts, the lifting time in the shift, standing or stooping, and the grip; if your time between lifts falls between two rows, pick the shorter one.
  4. Fix anything the Check column flags.
  5. Read each task's recommended weight limit, the load as a share of it and the multiplier that limits it most; on the Dashboard, start with the tasks furthest over the limit.

Frequently Asked Questions

What is the NIOSH lifting equation?
The revised NIOSH lifting equation gives a recommended weight limit (RWL) for a two-handed lift: RWL = 23 kg x HM x VM x DM x AM x FM x CM, where the multipliers are for the horizontal reach, the starting height, the vertical travel, the twist, the frequency and duration, and the grip. CCOHS publishes a table for each multiplier, and this workbook reads them all.
Can you show a worked example?
A 12 kg load lifted 50 cm from a hand height of 30 cm, 40 cm out from the body with a 30-degree twist, every 5 minutes for over an hour, standing, with a good grip: HM 0.63, VM 0.87, DM 0.91 (between the 40 and 55 cm rows), AM 0.90, FM 0.85 and CM 1.00 give an RWL of 8.78 kg. The 12 kg load is 137% of it, 3.22 kg over. The Ergonomic Risk Score calculator gives the same result.
What should I do when a load is over the recommended weight limit?
CCOHS's advice is to find the factor contributing the highest risk, the multiplier with the lowest value, and change the lift. The Limited most by column names it for each task. In the example, the palletizing lifts are limited by frequency (0.45 for lifts every 15 seconds for over an hour), so slowing the rate or rotating people helps more than anything else; most other tasks are limited by how far the hands reach out.
How are values between table rows handled?
Distances, heights and angles between two table rows are read on a straight line between them, which CCOHS allows: NIOSH allows extrapolation for values that do not match the figures in the tables, or you can use the next, more protective value. For frequency, pick the shorter time between lifts when yours falls between two rows. A reach over 60 cm or a twist over 90 degrees is beyond the tables and is not rated.
When does the NIOSH lifting equation not apply?
CCOHS lists lifting or lowering with one hand, for over 8 hours, seated or kneeling, in a restricted work space, unstable objects such as containers of liquids, while pushing or pulling, with wheelbarrows or shovels, at high speed (faster than about 0.76 m/s), hot or cold objects or extreme temperatures, and poor foot and floor coupling. Assess those tasks another way.