Industry Cost Kits
Pressure Vessel and Tank Cost Estimator Excel Template
Estimate a pressure vessel or tank's cost from its shell and head weights, bought-out items, shop hours, testing and coating, and price five order quantities.
Free, and a plain .xlsx with no macros to enable. A CSV with live formulas and a printed how-to guide come with it.
Overview
This pressure vessel cost estimator is a working Excel workbook for estimators, sales engineers and managers at vessel and tank fabricators, and for buyers who want to check a quote. It ships with a worked quote for a 48-inch carbon steel vertical air receiver from a fictional fabricator, so every block, chart and price is filled in the moment you open it; overwrite the yellow cells with your vessel and everything recalculates.
The shell and heads block turns inside diameter, shell length, wall and head thicknesses, head type and straight flange into the weight of the shell and of each head, the inside capacity and the outside surface to coat, in US or metric units. Shell plate is bought at your plate yield, as the Plate Yield calculator on this site defines it, and heads at your supplier's price. Nozzles and supports, shop hours by operation, welding consumables, radiography, coating and inspection are added per vessel, and the labour and engineering for an order match the Fabricated Vessel Cost calculator. Wall thicknesses come from your own code design: the workbook prices a vessel, it does not size one.
Five order quantities show how engineering, setup and radiography mobilisation spread out as orders grow, with the price rounded to your step, the price per pound of empty weight and the plate to order. The Dashboard picks one quantity for a summary you can send: price, cost, margin against your target, weight, shop hours, capacity and where the cost of a vessel goes.
What this template includes
- Shell and heads block: inside diameter, shell length, wall and head thicknesses, head type and straight flange give the shell and head weights, the inside capacity and the outside surface, in US or metric units
- Shell plate bought at your plate yield and priced per pound or kilogram, and heads at your supplier's price per formed head
- Tables for nozzles, supports and other bought-out items (cost and weight) and for shop hours by operation at your loaded shop rate, with welding consumables per vessel
- Radiography, coating, inspection and paperwork per vessel, and engineering, setup and radiography mobilisation once per order
- Five order quantities: every cost line per vessel, cost and price rounded to your step, margin, price per unit of empty weight, shop hours, labour and engineering, and shell plate to order
- Dashboard for the quantity you pick: price, cost, margin against your target, empty weight, shop hours, labour and engineering, plate to order and capacity, two charts and the cost build-up
- Method sheet with every formula, a Verify sheet that re-checks them against an independent reference (Self-check: PASS), and an About MFG Calcs sheet linking the live calculator and every free tool on the site
Suggested use case
Use it to quote a vessel or tank at several order quantities, to see what a thinner wall, a better plate nest or fewer shop hours is worth, or to check a fabricator's price against the weight and hours behind it.
How to use it
- On Setup, choose US or metric units and enter your company, currency, loaded shop rate, handling markup, target margin and price step, then your plate materials (density and price) and any head types you use.
- On Vessel Estimate, choose the plate material and head type and enter the inside diameter, shell length, wall and head thicknesses, straight flange, plate yield and price per formed head.
- List the nozzles, supports and other bought-out items with their cost and weight, and the shop hours for each operation.
- Enter the welding consumables, radiographs, coating, inspection and the engineering and setup per order, then type five order quantities.
- Read cost, price and margin for each quantity, and open the Dashboard to pick one and see where the cost goes.
Frequently Asked Questions
- How does the workbook work out a vessel's weight?
- The shell is a cylinder: pi times its mean diameter times its length times the wall times the plate's density. The example's 48-inch inside diameter and 0.3125-inch wall give a 48.3125-inch mean diameter; over a 120-inch shell at 7.85 g/cm3 that is 1,614.2 lb. Each 2:1 semi-ellipsoidal head is 1.0840 times its mean diameter squared plus its 2-inch straight flange, times its thickness and density, 251.1 lb. With 375 lb of nozzles, manway, legs and lugs, the vessel weighs 2,491 lb empty.
- Where do the head factors come from?
- From the geometry of each head. A 2:1 semi-ellipsoidal head's surface is (pi/4)(1 + ln(2 + sqrt 3) / (2 sqrt 3)) = 1.0840 times its diameter squared and its capacity pi/24 = 0.1309 times the diameter cubed; a hemispherical head's are pi/2 and pi/12; a torispherical head with a crown radius equal to the diameter and a knuckle radius of 6 percent of it comes to 0.9306 and 0.0810. The build checks each against a numerical integration. A head maker's catalogue weight can differ, because forming thins the plate.
- How is the price per vessel built up?
- Per vessel: shell plate bought at your plate yield (1,834.3 lb at 88 percent, 1,137.25 at 0.62 per lb), two heads at 540.00, 1,222.00 of bought-out items and a 10 percent handling markup on those three, 186.60 of welding consumables, 64 shop hours at 68.00 (4,352.00), six radiographs at 55.00, 119.31 of coating and 420.00 of inspection and paperwork. Engineering and setup (1,850.00) and radiography mobilisation (350.00) are paid once per order. For three vessels that is 9,924.42 each, priced at 12,410 for a 20 percent margin.
- Does it agree with the Fabricated Vessel Cost calculator?
- Yes. The calculator returns hours times the loaded shop rate times the share of hours charged, plus a fixed engineering and setup cost. The workbook charges every hour, so for three vessels its labour and engineering line is 192 hours at 68.00 plus 1,850.00 of engineering and setup, 14,906, or 77.64 per shop hour all-in: the calculator's answer with 100 percent of the hours charged.
- Can I use it in millimetres and kilograms, and does it size the wall?
- Choose Metric on Setup and type every dimension in millimetres, weights in kilograms and prices per kilogram; areas then show in square metres and capacity in litres. The conversions are exact: 1 in = 25.4 mm, 1 lb = 0.45359237 kg and 1 US gallon = 231 cubic inches. It does not size anything: wall and head thicknesses come from your own design calculation to the code you build to, and the workbook prices the vessel you have designed.