Industry Cost Kits

Print Job Cost Estimator Excel Template

Estimate a label or flexo print job from stock and ink per MSI, press speed and spoilage, makeready, plates and die, and price five quantities per 1,000 labels.

Free, and a plain .xlsx with no macros to enable. A CSV with live formulas and a printed how-to guide come with it.

Overview

This print job cost estimator is a working Excel workbook for label and flexo estimators, converter sales and plant managers and buyers who need a label price they can explain. It ships with a worked example, a five-colour white film label printed nine to a frame for a fictional customer, so every block, chart and price is populated the moment you open it; overwrite the yellow cells with your job and everything recalculates.

The estimate is built from frames, one repeat of the web. The web width times the repeat is the stock in a frame in MSI (thousand square inches), and at the stock and ink price per MSI that is the paper and ink cost of every frame run. The labels ordered divided by the labels per frame give the good frames; the good-copy yield adds the frames lost while running, and makeready adds press time and wasted web before the first good label. Running time comes from the running speed, and plates and proofing are charged at the share this run carries, so plates kept for repeat runs can be spread over them.

Each of the five quantities shows the good frames, frames run, press hours, every cost line per 1,000 labels, cost and price per 1,000, the margin achieved, the job cost, the order value and the stock to order. The same formulas are used by the Print Run Cost, Press Speed, Print Job Margin and Plate Cost Amortization calculators on this site, and the build checks the workbook against each of them.

What this template includes

Suggested use case

Use it to quote a label or flexible packaging print job, to see how much of a short run's price is makeready, plates and die, or to check a converter's label quote line by line.

How to use it

  1. On Setup, enter your company name, currency, overhead, margin and price step, then your label stocks with their price per MSI and your presses with their rate per hour, crew included.
  2. On Job Estimate, choose the stock and enter the web width, print repeat, labels across and around, and the ink and coating cost per MSI.
  3. Choose the press and enter the running speed, the good-copy yield, makeready hours and makeready footage.
  4. Enter the plates, imaging cost per plate, the share charged to this run, proofing, the cutting die and finishing per 1,000, then type five quantities.
  5. Read cost and price per 1,000 labels for each quantity, then pick a quantity on the Dashboard to see the tiles, the charts and the cost build-up.

Frequently Asked Questions

How is the cost of a label print job calculated?
Count frames, not labels. In the example, 50,000 labels at 9 per frame need 5,556 good frames, and at a 95% good-copy yield 5,848 frames are run. Each frame is 0.12375 MSI of stock at 0.68 plus 0.06 of ink per MSI, about 0.0916, or 10.71 per 1,000 labels. Press running time, makeready, plates and proofing, the die, finishing and overhead are added, for a cost of 39.14 and a price of 56.00 per 1,000 at a 30% margin on price.
How do I work out label stock in MSI?
MSI is thousands of square inches: width in inches times length in inches divided by 1,000. A 10-inch web with a 12.375-inch repeat is 0.12375 MSI per frame, and 800 feet of makeready waste on the same web is 800 x 12 x 10 / 1,000 = 96 MSI. The stock to order is the frames run times the repeat, plus the makeready footage, in MSI.
How fast does the press need to run?
A frame passes once per repeat, so frames per hour = speed in feet per minute x 720 / repeat in inches. At 225 ft/min and a 12.375-inch repeat that is about 13,091 frames an hour; at 95% good, 12,436 good frames, or about 111,927 labels at 9 per frame. The Press Speed calculator works it the other way: 12,436.36 good frames an hour at 95% and a 12.375-inch repeat need 225 ft/min.
How should I charge plates on a repeat job?
Charge the share of the plate imaging that this run should carry: 100% for a one-off job, 25% to each of four runs when the plates are kept. Five plates at 38 each plus 120 of proofing is 310.00 charged in full; at 25% it is 5 x 38 x 0.25 + 120 = 167.50. That is the Plate Cost Amortization calculator's formula.
Why does the price per 1,000 fall so much with quantity?
Makeready time and waste, plates, proofing and the die cost the same whatever the run length: 1,129.79 in the example. Spread over 10,000 labels that is 112.98 per 1,000; over 250,000 it is 4.52. Stock, ink, running time and finishing stay about the same per 1,000, so short runs are mostly setup cost.