Refractory Lining Cost Log Excel Template

Log every reline and repair on furnaces, converters and ladles and see refractory cost per tonne of metal, kilograms per tonne, lining life and downtime cost by campaign.

Free, and a plain .xlsx with no macros to enable. A CSV with live formulas and a printed how-to guide come with it.

Overview

This refractory lining cost log is a working Excel workbook for melt shop and foundry managers, refractory and maintenance engineers and cost accountants who track what linings cost. It ships with example relines and repairs from late June to November 2026 on a fictional steel foundry's induction furnace, AOD vessel and ladle, so the dashboard, charts and campaign table are populated the moment you open it; replace the example rows with your own and everything recalculates.

Each job row is one reline, hot repair or patch. The workbook prices the refractory as bought, not as placed: the tonnes installed divided by the share that ends up in the lining, so gunning rebound and mixing waste are paid for. Setup and dry-out are added, then the crew hours at your rate or a contractor's with any mobilization charge, and finally the downtime, priced at what an hour of the vessel being down loses, for the share of the downtime that really cost output. These are the formulas of the Cost Per Lining Job, Installation Labor and Furnace Downtime Cost calculators on this site, and the build checks the workbook against all three.

The Campaigns sheet gathers the jobs on each lining, from the reline that started it to the repairs that kept it going, and once the lining comes out divides its cost by the tonnes of metal it processed. That gives the refractory cost per tonne, the all-in cost per tonne with downtime, the kilograms of refractory per tonne and the cost per heat, so linings, products and installers can be compared on the same basis.

What this template includes

Suggested use case

Use it to put a cost per tonne on each furnace, converter or ladle lining, to compare refractory products and installers by kg per tonne and lining life, or to show what relines really cost once downtime is counted.

How to use it

  1. On Setup, enter your company, currency and crew rate, then your vessels with the contribution an hour of downtime loses, and your refractory materials with their price per tonne and usable share.
  2. On Campaigns, add one row per lining: the campaign name, vessel, the date it went in, and the date it came out when it does.
  3. On Lining Jobs, add one row per reline, repair or patch: vessel, campaign, material and tonnes installed, setup and dry-out, crew hours and any contractor rate and mobilization, and the downtime.
  4. When a lining comes out, type the end date and the heats and tonnes of metal it processed; its cost per tonne, kg per tonne and cost per heat appear.
  5. On the Dashboard, pick a vessel to read its cost per tonne, kg per tonne and lining life, and compare every vessel and campaign.

Frequently Asked Questions

How do you calculate refractory cost per tonne?
Add up everything spent on one lining over its campaign, the reline and every repair after it, and divide by the tonnes of metal the lining processed. In the example, the AOD vessel's campaign A14 cost 98,958 in refractory, setup and labour over 1,966 tonnes: 50.33 per tonne, or 749.68 per heat over its 132 heats.
What is refractory consumption in kg per tonne?
The tonnes of refractory installed in a lining over its campaign, times 1,000, divided by the tonnes of metal it processed. The example's AOD campaign A14 took 31 tonnes of brick at its reline and 4.8 tonnes of gunning mix in two hot repairs, 35.8 tonnes for 1,966 tonnes of metal: 18.21 kg per tonne.
How do rebound and waste change the cost of a lining?
You pay for refractory that never reaches the lining, so the workbook divides the tonnes installed by the usable share. Brick at 95% usable needs 23.68 tonnes bought for 22.5 tonnes placed; gunning mix at 80% needs 3.0 tonnes bought for 2.4 tonnes placed. That is the Cost Per Lining Job calculator's yield-loaded cost.
Should downtime be counted in the cost of a reline?
Count it, but keep it separate. In the example, the AOD vessel's October reline cost 91,558 in brick, dry-out, contract labour and mobilization, and its 84 hours of downtime at 2,800 an hour of lost contribution cost 235,200 more. The workbook shows refractory cost per tonne and all-in cost per tonne side by side, and counts only the share of downtime that really cost output.
How do I compare two linings or refractory products?
Compare completed campaigns on the same vessel by cost per tonne, kg per tonne, cost per heat and life in heats. In the example, the induction furnace's two completed linings came to 6.53 and 6.38 per tonne; a product or installer that lasts more heats for the same price shows up straight away.