Rotational Molding Cost Estimator Excel Template

Estimate a rotationally molded part's cost from its powder charge, mold-bank cycle, oven energy, finishing, setup and mold, and price five order quantities.

Free, and a plain .xlsx with no macros to enable. A CSV with live formulas and a printed how-to guide come with it.

Overview

This rotational molding cost estimator is a working Excel workbook for rotomolding estimators, sales and plant managers, and buyers of tanks and rotomolded parts. It ships with a worked quote for a 500-litre LLDPE water tank from a fictional molder, so every block, chart and price is filled in the moment you open it; overwrite the yellow cells with your part and everything recalculates.

The material block turns midwall area, wall thickness and density into the powder charge, the same way the Powder Charge Weight calculator on this site does. The machine block turns parts per cycle, cycle time and shift time into complete cycles and parts per shift, like the Mold Capacity per Shift calculator, and prices a cycle from the arm or machine rate, operator minutes and oven energy. Orders run in whole cycles, scrapped parts are remolded, and the cost per part is the Finished Part Cost calculator's total cost over the accepted parts.

Five order quantities show how setup spreads out as orders grow, with the price rounded to your step and the material to order. The Dashboard picks one quantity for a summary you can send: price, cost, margin against your target, cycles and shifts on the mold bank, and where the cost of a part goes.

What this template includes

Suggested use case

Use it to quote a tank or rotomolded part at several order quantities, to see what a thinner wall, a faster cycle or another mold on the arm is worth, or to check a molder's price against the cost behind it.

How to use it

  1. On Setup, enter your company, currency, labour rate, gas and electricity prices, overhead, target margin and price step, then your materials (density and price) and machines or arms (rate per hour).
  2. On Part Estimate, choose the material and enter the midwall surface area from CAD, the wall thickness, the loss you measure per part and the inserts and fittings.
  3. Choose the machine or arm and enter the parts per cycle, the cycle time, the mold-bank time per shift, the operator minutes and the oven gas and electricity per cycle.
  4. Enter finishing minutes, acceptance, setup hours, packaging and the mold's cost, share and life, then type five order quantities.
  5. Read cost, price and margin for each quantity, and open the Dashboard to pick one and see where the cost goes.

Frequently Asked Questions

How is the powder charge worked out?
Wall mass is midwall area times wall thickness times density. The example tank has 3.77 m2 of midwall area at 5 mm, which is 18.85 litres of wall; at 935 kg/m3 that is 17.62 kg, and with 0.30 kg of measured loss the charge is 17.92 kg. The Powder Charge Weight calculator's own example, 3 m2 at 5 mm and 935 kg/m3 with 0.1 kg of loss, gives a 14.125 kg charge.
How many parts can a mold bank make in a shift?
Complete cycles are the shift's minutes divided by the cycle, rounded down. 450 minutes at a 47-minute (2,820-second) cycle is 9 cycles, or 18 tanks with two molds, with 27 minutes short of another cycle. The Mold Capacity per Shift calculator's example, 480 minutes at 3,000 seconds with four parts per cycle, is 9 cycles, 36 parts and 30 minutes left over.
What goes into the cost of a cycle?
The arm or machine rate for the cycle time, the operators' minutes to demold, clean, charge and close, and the oven gas and electricity you meter. In the example a 47-minute cycle on an arm costed at 38.00 an hour is 29.77, 20 operator minutes at 32.00 an hour is 10.67, and 4.5 m3 of gas at 0.45 plus 6 kWh at 0.14 is 2.87, so a cycle of two tanks costs 43.30 before overhead.
Why does a small order cost more per part?
Setup is charged once per order, and the last cycle is paid in full even when some molds are not needed. In the example, 20 tanks need 21 molded, which takes 11 cycles with one mold idle on the last, and setup adds 8.75 per tank; at 100 tanks setup is 1.75 per tank and the cost per tank falls from 101.01 to 90.94.
How does it agree with the Finished Part Cost calculator?
The calculator divides a run's material, direct labour, energy and other costs by the accepted parts. The workbook groups its lines the same way: material and inserts; operators, finishing and the setup operator; oven gas and electricity; and the arm or machine, mold, packaging and overhead. For the example order of 100 tanks those four pools come to 4,850.77, 1,300.27, 148.98 and 2,794.34, a total of 9,094.35, or 90.94 per accepted tank.