Production and Throughput
Six Big Losses Tracker Excel Template
Log each machine's shift and see how much planned time went to breakdowns, setups, minor stops, reduced speed and rejects, with an OEE waterfall and a Pareto of the six losses.
Free, and a plain .xlsx with no macros to enable. A CSV with live formulas and a printed how-to guide come with it.
Overview
This six big losses tracker is a working Excel workbook for TPM teams, production supervisors and maintenance leads who know their OEE but not where the rest of the time went. It ships with two weeks of example data for a fictional four-press stamping plant, so the waterfall, Pareto and charts are populated the moment you open it; replace the example rows with your own and everything recalculates.
Each row is one machine-shift. You type the planned minutes, the minutes lost to breakdowns, setup and adjustments and minor stops, the units made and the startup and production rejects. The workbook works out the rest from the product's ideal cycle time: reduced speed is the run time left after minor stops and the ideal-rate time of everything made, and each kind of reject becomes minutes at the ideal cycle. Availability, performance, quality and OEE use the same formulas as the OEE Calculator on this site, and the six losses always add up to planned time minus fully productive time.
In practice, fill in the log at the end of each shift and review the Dashboard weekly. The waterfall shows how planned time shrinks to fully productive time, the Pareto shows which loss to work on first, and the by-machine chart shows where each loss lives: in the example, slow running on one press, long die changes on another and misfeeds on a third.
What this template includes
- Production Log: one row per machine per shift with planned minutes, breakdown, setup and minor-stop minutes, total units, and startup and production rejects
- Reduced speed worked out for you as the run time left after minor stops and the ideal-rate time of everything made, plus good units, availability, performance, quality and OEE for every row
- Check column that names problems in words: stops longer than planned time, more rejects than units made, a rate above the ideal cycle, minor stops larger than the speed loss, duplicate shift rows
- Dashboard with machine and date filters, OEE, availability, performance and quality tiles against your targets, hours lost, the biggest loss and the share lost to speed
- Four native charts: a waterfall from planned time to fully productive time, a Pareto of the six losses, and the six losses by machine and by day
- Time model table, by-machine, daily and weekly summaries that add minutes first and divide last, so the six losses always add up to planned minus productive time
- Method sheet with every formula, a Verify sheet that re-checks them against an independent reference (Self-check: PASS), and an About MFG Calcs sheet linking the live OEE Calculator and every free tool on the site
Suggested use case
Use it when OEE is below target and you need to know which loss to attack first, in a TPM or continuous-improvement program, or to show how much capacity is hidden in minor stops and slow running that a downtime log never records.
How to use it
- On Setup, enter your plant name and OEE, availability, performance and quality targets, then replace the example machines, shifts and products with your own, each product with its ideal cycle time.
- On Production Log, add one row per machine per shift with planned minutes, breakdown, setup and minor-stop minutes, total units, and startup and production rejects.
- Fix anything the Check column flags; reduced speed, good units and OEE are calculated for you.
- Open the Dashboard to see where planned time went on the waterfall and which loss leads the Pareto.
- Filter by machine or dates, then attack the biggest loss and watch its bar shrink week by week.
Frequently Asked Questions
- What are the six big losses?
- Breakdowns and setup and adjustments (availability losses), minor stops and reduced speed (performance losses), and startup rejects and production rejects (quality losses). In the example plant, 600 planned hours lose 160: 62.1 to reduced speed, 31.3 to setups, 30.6 to minor stops, 27.7 to breakdowns, 5.3 to production rejects and 3.0 to startup rejects, which leaves 440 fully productive hours and an OEE of 73.3 percent.
- How is reduced speed calculated if nobody times slow running?
- It is what is left of the run time. Take the OEE Calculator's example: 480 planned minutes minus 40 minutes of breakdowns and 20 of setup leaves 420 minutes of run time. 700 parts at a 30-second ideal cycle are 350 minutes of net run time, and 10 minutes of minor stops were logged, so reduced speed is 420 - 10 - 350 = 60 minutes.
- Where is the line between a minor stop and a breakdown?
- Choose one length, for example five minutes, and use it on every machine: shorter stops are minor stops, longer ones are breakdowns. The workbook takes the minutes as you log them, so the split is yours. If you do not track minor stops at all, leave them at 0 and the whole speed loss shows as reduced speed.
- How do startup rejects differ from production rejects?
- Startup rejects are made while the process settles after a setup or a restart; production rejects are made during steady running. Both are typed in units and turned into minutes at the ideal cycle: in the calculator example, 15 startup rejects and 20 production rejects at 30 seconds each cost 7.5 and 10 minutes, and good units are 700 - 35 = 665.
- How is this different from the OEE Tracker?
- The OEE Tracker logs every stop with a reason code and shows OEE with its three factors. This workbook splits each factor into its two big losses, including the minor stops and slow running a stop log cannot see. In the example, performance is 82.9 percent against a 90 percent target, and the Pareto shows why: reduced speed alone is 38.8 percent of the hours lost.