Thermoforming Cost Estimator Excel Template
Estimate a vacuum formed or pressure formed part from its sheet, nesting yield, cycle, electricity, trimming and tool, and price five order quantities per 1,000 parts.
Free, and a plain .xlsx with no macros to enable. A CSV with live formulas and a printed how-to guide come with it.
Overview
This thermoforming cost estimator is a working Excel workbook for thermoforming estimators, sales and plant managers and buyers who need a part price they can explain. It ships with a worked example, a black HIPS component tray formed four to a sheet for a fictional customer, so every block, chart and price is populated the moment you open it; overwrite the yellow cells with your part and everything recalculates.
The estimate follows the sheet. You buy the whole sheet but sell only the area inside the parts' trim lines, so the workbook works out the sheet's weight and cost from its size, gauge and density, the sheet area yield from the parts per sheet and each part's blank footprint, and credits the skeleton at its regrind or scrap value. The cycle is the heating, forming, cooling and load times added together; from it come the sheets and good parts per hour, the machine and crew cost per part and the electricity per sheet from the line's metered power. Trimming and packing labour, packaging, setup, start-up sheets, order handling, tool amortisation and overhead complete the cost.
Each of the five order quantities shows the sheets to form, machine hours, every cost line per part, cost and price per 1,000, the margin achieved and the sheets and kilograms to order. The same formulas are used by the Formed Part Cost, Nesting Yield, Forming Cycle Time, Energy Cost per Sheet and Line Throughput calculators on this site, and the build checks the workbook against each of them.
What this template includes
- Sheet and nesting block: sheet size, gauge and the material's price and density give the sheet's weight and cost; parts per sheet and each part's blank footprint give the sheet area yield against your target, and the skeleton is credited at its regrind or scrap value
- Cycle block: heating, forming, cooling and load times add to the cycle and its margin to your limit, with sheets and good parts per hour from a sampled acceptance, and the rate the schedule needs
- Electricity per sheet from the line's average metered power, and machine and crew cost per hour from the Setup machine list
- Five order quantities with sheets to form, machine hours, eight cost lines per part, cost and price per 1,000 rounded to your step, margin, and sheets and kilograms to order
- Dashboard for the quantity you pick: price, cost, margin, good parts per hour, machine hours, sheets and kilograms to order and sheet yield, a price and cost chart, a cost-split chart and the cost build-up
- Check cells that name problems in words: a material or machine not on the Setup lists, parts that take more than the sheet, a cycle over the planned limit or output below the rate needed
- Method sheet with every formula, a Verify sheet that re-checks them against an independent reference (Self-check: PASS), and an About MFG Calcs sheet linking the live calculators and every free tool on the site
Suggested use case
Use it to quote a thermoformed tray, cover, clamshell or enclosure part, to see how the nest and the cycle move the price, or to check a supplier's thermoforming quote line by line.
How to use it
- On Setup, enter your company name, currency, labour and electricity rates, overhead, margin and price step, then your sheet materials (price and density) and machines.
- On Part Estimate, choose the sheet material and enter the sheet size, gauge, parts per sheet, each part's blank footprint and the skeleton credit.
- Enter the heating, forming, cooling and load times, the line's metered power, a sampled acceptance, the crew and the rate the schedule needs.
- Enter the trim and pack time per part, packaging, setup hours, start-up sheets, order handling and the tool, then type five order quantities.
- Read cost and price per 1,000 for each quantity, then pick a quantity on the Dashboard to see the tiles, the charts and the cost build-up.
Frequently Asked Questions
- How is the cost of a thermoformed part calculated?
- Material is the sheet cost less the skeleton credit, per sheet, divided by the good parts each sheet gives. Machine and crew cost and electricity are per sheet formed, trimming and packing labour and packaging are per good part, setup, start-up sheets and order handling are spread over the order, the tool over the parts expected in its life, and overhead is added on machine, crew, trimming and setup. In the example, 5,000 trays need 1,276 sheets; the cost is 2.7169 per tray and the price 3,623 per 1,000 at a 25% margin on price.
- How do I work out the sheet yield of a nest?
- Multiply the blank footprint of one part (the flat sheet area inside its trim line) by the parts per sheet and divide by the sheet area. Four trays of 2,300 cm2 on a 1,200 x 1,000 mm sheet (12,000 cm2) use 9,200 cm2, a 76.7% yield, 1.7 points above a 75% target. The Nesting Yield calculator gives the same answer.
- How is the skeleton credit worked out?
- The skeleton weighs the sheet weight times the share of the sheet that is not in parts. A 2.0 mm HIPS sheet of 1,200 x 1,000 mm at 1.04 g/cm3 weighs 2.496 kg, so 23.3% of it is 0.582 kg. If 90% of that is reground or sold at 0.35 per kg, the credit is about 0.18 per sheet. Set the credit to 0 if the skeleton is thrown away.
- How is electricity per sheet calculated?
- Use the line's average metered power over a similar run, not the heaters' nameplate. Average kW times the cycle in hours gives the kWh per sheet: 36 kW for a 110-second cycle is 1.1 kWh, or 0.132 per sheet at 0.12 per kWh. That is the Energy Cost per Sheet calculator's method, metered energy divided by the sheets formed.
- What cycle time should I enter for a rotary or in-line machine?
- The workbook adds heating, forming, cooling and load times, which is right for a single-station machine where the phases run one after another. On a rotary or in-line machine the stations work at the same time and the slowest one sets the pace, so enter that station's index time as the heating time and the other phases as 0.