Semiconductor Advanced Packaging & Test calculator

Underfill Usage Calculator

Work out how much underfill each flip chip needs before setting the dispense. You need the die length and width, the gap under the die, die thickness, fillet width and the bumps' share of the gap.

What this calculator does

  • Underfill a flip chip needs per die, from die size, the gap, die thickness, fillet width and the share of the gap the bumps fill.

Formula used

  • Gap volume = die length × die width × gap under the die ÷ 1,000, in µL (mm³)
  • Volume under the die = gap volume × (1 − bump share of the gap ÷ 100)
  • Fillet prism = 2 × (die length + die width) × die thickness ÷ 1,000 × fillet width ÷ 2
  • Fillet volume = fillet prism + π × fillet width² × die thickness ÷ 1,000 ÷ 3, the corner cone
  • Underfill per die = volume under the die + fillet volume; fillet share = fillet volume ÷ underfill per die × 100

Inputs explained

  • Die Length: Die length from the die drawing.
  • Die Width: Die width from the die drawing.
  • Gap Under the Die: Bump height after reflow, die to substrate, from cross sections.
  • Die Thickness: Die thickness, which sets the fillet height.
  • Fillet Width: Fillet width allowed beyond the die edge, from the package drawing.
  • Bump Share of the Gap: Share of the gap the bumps fill, from bump count and size.

How to use the result

  • Best suited to setting dispense volume for a new flip chip, checking a dispense weight against geometry, comparing fillet widths for a tight layout.
  • Does not include dispense needle waste, purge or underfill that bleeds past the fillet width.

Current U.S. benchmarks

  • The producer price index for primary nonferrous metals (a broad metals benchmark, not copper alone) stands at 589.63 (BLS, Oct 2026), up 42.7% from a year earlier. Quotes priced off last quarter's material cost miss this move. Global copper trades at $14,473 per tonne (IMF via FRED, Sep 2026).
  • The producer price index for plastic resins and materials stands at 283.88 (BLS, Oct 2026), up 9.5% from a year earlier. Quotes priced off last quarter's material cost miss this move.
  • The producer price index for paper (not a paperboard or container index) stands at 285.77 (BLS, Oct 2026), up 11.5% from a year earlier. Quotes priced off last quarter's material cost miss this move.
  • The U.S. has 11,261 computer and electronic products establishments employing about 815,443 workers (Census County Business Patterns, 2023).

Common questions

  • How is the underfill volume worked out? As the adhesive under the die plus the fillet. Under the die it is die area × bump height minus the bump volume; the fillet is a prism along the edges plus a cone at the corners.
  • Why does fillet width matter so much? The fillet runs around the whole die perimeter, so a small change in width moves a lot of volume. On a 10 mm die with a 0.5 mm fillet the fillet is about a third of the dispense.
  • How do I get the bump share of the gap? Multiply the bump count by the volume of one reflowed bump and divide by the gap volume, die area × gap. Dense arrays of large bumps take a bigger share.
  • What dispense weight should I set? Multiply the volume per die by your underfill's density from its data sheet, then check the first parts' fillets and adjust.

Last reviewed 2026-11-12.