Thermal Spray, Hardfacing & Wear Coatings calculator
Deposition Efficiency Calculator
Measure how much fed material remains as coating on the intended part. Enter the matching feed, deposit and spray-time measurements plus your retention target.
What this calculator does
- Measure how much fed material remains as coating on the intended part.
Formula used
- Efficiency = 100 × Deposited kilograms ÷ Fed kilograms
- Nondeposit mass = Fed kilograms − Deposited kilograms
- Deposition rate = 60 × Deposited kilograms ÷ Spray minutes
- Efficiency margin = Measured efficiency − Target efficiency
Inputs explained
- Deposited Coating Mass: Dry mass gain on intended surfaces, corrected for substrate change.
- Feedstock Delivered: Feedstock mass delivered during the same measured run.
- Feed-On Spray Time: Logged time with material actually feeding to the gun.
- Target Deposition Efficiency: Required material retention for this qualified part and process.
How to use the result
- Best suited to coupon efficiency trials, feedstock loss reviews.
- Oxidation or decarburization can invalidate a simple weigh-back mass balance.
Current U.S. benchmarks
- Industrial electricity averages 9.52 cents per kWh across the U.S. (EIA, Sep 2026), up 7% from a year earlier. Energy-intensive steps carry this directly into unit cost.
- The producer price index for industrial chemicals stands at 345.03 (BLS, Oct 2026), up 17.1% from a year earlier. Quotes priced off last quarter's material cost miss this move.
- The U.S. has 14,543 chemical manufacturing establishments employing about 911,245 workers (Census County Business Patterns, 2023).
Common questions
- Is deposition efficiency the same as feed rate? No. Efficiency is the retained mass fraction; feed rate is material delivered per unit time.
- Should masking deposits count as retained coating? No. Count only coating on the intended part surfaces; masking deposits belong in the nondeposit balance.
- Why can a weigh-back result exceed the feed mass? Oxidation, moisture, weighing errors or mismatched intervals can distort the balance. Correct the measurement basis before using this model.
- Does higher efficiency prove a better coating? No. Inspect thickness, adhesion and other specified coating properties separately.
Last reviewed 2026-10-12.