Thermal Spray, Hardfacing & Wear Coatings calculator
Spray Cycle Time per Part Calculator
Estimate per-part spray and elapsed time from deposited mass and qualified feed settings. Enter required deposit mass, calibrated feed and separate cooling and handling pauses.
What this calculator does
- Estimate per-part spray and elapsed time from deposited mass and qualified feed settings.
Formula used
- Spray minutes = 100 × Deposit grams ÷ (Feed grams per minute × Efficiency percent)
- Elapsed minutes = Spray minutes + Cooling minutes + Handling minutes
- Powder feed grams = 100 × Deposit grams ÷ Efficiency percent
Inputs explained
- Required Deposit Mass: Coating mass required on one accepted part.
- Calibrated Powder Feed: Measured powder feed at the qualified operating setting.
- Measured Deposition Efficiency: Retained mass percentage from comparable part trials.
- Cooling Pause Time: Total qualified cooling pauses for one part.
- Handling and Indexing Time: Nonoverlapping loading, unloading and positioning time per part.
How to use the result
- Best suited to pump sleeve scheduling, coating cycle quotes.
- Acceleration, interpass constraints and temperature recovery need measured time inputs.
Current U.S. benchmarks
- Industrial electricity averages 9.52 cents per kWh across the U.S. (EIA, Sep 2026), up 7% from a year earlier. Energy-intensive steps carry this directly into unit cost.
- The producer price index for industrial chemicals stands at 345.03 (BLS, Oct 2026), up 17.1% from a year earlier. Quotes priced off last quarter's material cost miss this move.
- The U.S. has 14,543 chemical manufacturing establishments employing about 911,245 workers (Census County Business Patterns, 2023).
Common questions
- Can powder feed rate replace deposition rate? Only after applying the measured deposition efficiency. Delivered powder and coating retained on the part are different quantities.
- Should cooling be a percentage of spraying? Use observed or qualified pause minutes here. Cooling time need not scale proportionally with feed time.
- Does the output permit a faster spray recipe? No. It estimates timing for the settings you enter and does not qualify changes to heat input or coating properties.
- What if handling overlaps cooling? Enter only the additional handling time outside the cooling interval so elapsed time is not counted twice.
Last reviewed 2026-10-12.