Wire, Cable & Conductor Manufacturing calculator
Concentric Extrusion Wall Thickness Calculator
Calculate nominal radial wall from concentric cable diameters. Enter finished and under-layer outside diameters plus the specified nominal wall.
What this calculator does
- Calculate nominal radial wall from concentric cable diameters.
Formula used
- Concentric radial wall = (Finished OD − Under-layer OD) ÷ 2
- Nominal deviation = Concentric wall − Specified nominal wall
- Diametral build = Finished OD − Under-layer OD
Inputs explained
- Finished Outside Diameter: Measured or specified diameter after extrusion.
- Diameter Under Extrusion: Outside diameter of the underlying construction.
- Specified Nominal Radial Wall: Nominal radial wall from the cable construction.
How to use the result
- Best suited to nominal extrusion build, Diameter-Based wall review.
- Minimum local wall and dielectric acceptance require direct measurement and the applicable specification.
Current U.S. benchmarks
- The producer price index for primary nonferrous metals (a broad metals benchmark, not copper alone) stands at 589.63 (BLS, Oct 2026), up 42.7% from a year earlier. Quotes priced off last quarter's material cost miss this move.
- The U.S. has 5,397 electrical equipment and appliances establishments employing about 369,437 workers (Census County Business Patterns, 2023).
Common questions
- Is this measured minimum wall? No. Eccentricity can make local wall thinner than the concentric estimate.
- Can equal diameters be entered? Yes. Equal diameters represent zero added radial wall.
- Which underlying diameter is needed? Use the outside diameter immediately beneath the extrusion layer being evaluated.
- Does a negative deviation reject the cable? It flags a difference from nominal; apply the actual specified tolerances and measurement method separately.
Last reviewed 2026-10-12.