Arizona energy profile
Manufacturing energy costs in Arizona
The current industrial power rate in Arizona is 9.73 cents per kWh (Aug 2026, EIA), ranking 27 of 51 (50 states and DC) and sitting 0.9% above the national average.
Current prices in Arizona
- Industrial electricity: 9.73 cents per kWh (Aug 2026, EIA).
- Commercial electricity, the rate a warehouse or distribution center in Arizona typically pays: 13.05 cents per kWh.
- Industrial natural gas: $4.21 per Mcf (Aug 2026), 3% below the national average.
- Just below Arizona on the price ladder: Iowa at 9.31, South Dakota at 9.43, Idaho at 9.71 cents. Just above: Ohio at 9.75, Missouri at 9.89, Minnesota at 9.96 cents.
What the rate does to operating cost
- A 10 kW machine running a 4,000 hour year costs about $3,892 in electricity at Arizona rates versus $3,856 at the national average; at 50 kW the gap is $19,460 versus $19,280, and at 200 kW it is $77,840 versus $77,120.
- With rates near the national middle, Arizona plants can use U.S.-average defaults for rough estimates, then refine against the utility tariff. The bigger lever is usually consumption, not the rate.
Cost to manufacture in Arizona
- Arizona scores 102.0 on the MFG Calcs State Cost-to-Manufacture Index, where the U.S. is 100: the 29th lowest of 51 (electricity averaged over the 12 months to Aug 2026, wages from the 2025 survey).
- Its labor factor (manufacturing wages) is 103.2 and its energy factor (industrial electricity) 87.6; the index weighs wages at 92% and electricity at 8%, their shares of what manufacturers spend on labor and purchased energy, and leaves out taxes, land and incentives.
What factory labor pays in Arizona
- Industrial production managers: $60.01/hr median in Arizona versus $60.61 nationally (OEWS 2025).
- Industrial engineers: $52.06/hr median in Arizona versus $49.25 nationally (OEWS 2025).
- Production supervisors: $36.22/hr median in Arizona versus $35.79 nationally (OEWS 2025).
- Industrial machinery mechanics: $35.96/hr median in Arizona versus $31.02 nationally (OEWS 2025).
- Machinists: $29.37/hr median in Arizona versus $28.24 nationally (OEWS 2025).
- Tool and die makers: $28.44/hr median in Arizona versus $30.79 nationally (OEWS 2025).
Manufacturing jobs in Arizona
- Arizona had 193,000 manufacturing jobs in Oct 2026, the 24th most of 51 (BLS State and Metro Area Employment, not seasonally adjusted).
- That is up 0.1% from Oct 2025.
Manufacturing base in Arizona
- Arizona has 4,406 manufacturing establishments employing about 173,706 workers (Census County Business Patterns, 2023).
- Average pay per manufacturing employee is $86,957, 19% above the U.S. average of $73,202.
- Largest sectors by establishment count: fabricated metal products (975), printing and related support (399), machine shops (318), food manufacturing (307), machinery manufacturing (269).
Manufacturing economy in Arizona
- Manufacturing added $44.0B to Arizona's economy in 2025, 7.4% of the state's GDP, the 25th largest of the 50 states and DC (BEA).
Sources and update cadence
- Prices come from the U.S. Energy Information Administration, jobs from the Bureau of Labor Statistics, establishments and payroll from the Census Bureau and GDP from the Bureau of Economic Analysis; each refreshes automatically when the agency publishes, and this page archives every month and year it shows so the Arizona history keeps deepening.
Last reviewed 2026-11-20.