Iowa energy profile

Manufacturing energy costs in Iowa

As of Aug 2026, industrial electricity in Iowa runs 9.31 cents per kWh. That is 3.4% cheaper than the U.S. average and places it 24 of 51 nationally (50 states and DC).

Current prices in Iowa

  • Industrial electricity: 9.31 cents per kWh (Aug 2026, EIA).
  • Commercial electricity, the rate a warehouse or distribution center in Iowa typically pays: 14.15 cents per kWh.
  • Industrial natural gas: $5.36 per Mcf (Aug 2026), 23.5% above the national average.
  • Just below Iowa on the price ladder: Florida at 8.93, Michigan at 8.99, Indiana at 9.28 cents. Just above: South Dakota at 9.43, Idaho at 9.71, Arizona at 9.73 cents.

What the rate does to operating cost

  • A 10 kW machine running a 4,000 hour year costs about $3,724 in electricity at Iowa rates versus $3,856 at the national average; at 50 kW the gap is $18,620 versus $19,280, and at 200 kW it is $74,480 versus $77,120.
  • With rates near the national middle, Iowa plants can use U.S.-average defaults for rough estimates, then refine against the utility tariff. The bigger lever is usually consumption, not the rate.

Cost to manufacture in Iowa

  • Iowa scores 98.2 on the MFG Calcs State Cost-to-Manufacture Index, where the U.S. is 100: the 18th lowest of 51 (electricity averaged over the 12 months to Aug 2026, wages from the 2025 survey).
  • Its labor factor (manufacturing wages) is 99.5 and its energy factor (industrial electricity) 82.9; the index weighs wages at 92% and electricity at 8%, their shares of what manufacturers spend on labor and purchased energy, and leaves out taxes, land and incentives.

What factory labor pays in Iowa

  • Industrial production managers: $51.21/hr median in Iowa versus $60.61 nationally (OEWS 2025).
  • Industrial engineers: $46.96/hr median in Iowa versus $49.25 nationally (OEWS 2025).
  • Production supervisors: $35.94/hr median in Iowa versus $35.79 nationally (OEWS 2025).
  • Tool and die makers: $31.25/hr median in Iowa versus $30.79 nationally (OEWS 2025).
  • Industrial machinery mechanics: $30.96/hr median in Iowa versus $31.02 nationally (OEWS 2025).
  • Machinists: $27.66/hr median in Iowa versus $28.24 nationally (OEWS 2025).

Manufacturing jobs in Iowa

  • Iowa had 214,900 manufacturing jobs in Oct 2026, the 23rd most of 51 (BLS State and Metro Area Employment, not seasonally adjusted).
  • That is up 0.3% from Oct 2025.

Manufacturing base in Iowa

  • Iowa has 3,418 manufacturing establishments employing about 224,293 workers (Census County Business Patterns, 2023).
  • Average pay per manufacturing employee is $69,570, 5% below the U.S. average of $73,202.
  • Largest sectors by establishment count: fabricated metal products (577), food manufacturing (503), machinery manufacturing (375), printing and related support (284), chemical manufacturing (202).

Manufacturing economy in Iowa

  • Manufacturing added $45.7B to Iowa's economy in 2025, 16.8% of the state's GDP, the 24th largest of the 50 states and DC (BEA).

Sources and update cadence

  • Prices come from the U.S. Energy Information Administration, jobs from the Bureau of Labor Statistics, establishments and payroll from the Census Bureau and GDP from the Bureau of Economic Analysis; each refreshes automatically when the agency publishes, and this page archives every month and year it shows so the Iowa history keeps deepening.

Last reviewed 2026-11-20.