Idaho energy profile

Manufacturing energy costs in Idaho

The current industrial power rate in Idaho is 9.71 cents per kWh (Aug 2026, EIA), ranking 26 of 51 (50 states and DC) and sitting 0.7% above the national average.

Current prices in Idaho

  • Industrial electricity: 9.71 cents per kWh (Aug 2026, EIA).
  • Commercial electricity, the rate a warehouse or distribution center in Idaho typically pays: 10.21 cents per kWh.
  • Industrial natural gas: $4.26 per Mcf (Aug 2026), 1.8% below the national average.
  • Just below Idaho on the price ladder: Indiana at 9.28, Iowa at 9.31, South Dakota at 9.43 cents. Just above: Arizona at 9.73, Ohio at 9.75, Missouri at 9.89 cents.

What the rate does to operating cost

  • A 10 kW machine running a 4,000 hour year costs about $3,884 in electricity at Idaho rates versus $3,856 at the national average; at 50 kW the gap is $19,420 versus $19,280, and at 200 kW it is $77,680 versus $77,120.
  • Idaho sits mid-pack for power cost, so energy is neither a site-selection advantage nor a penalty. Estimates built on national averages will land close here, though demand charges and rate schedules still swing the real bill.

Cost to manufacture in Idaho

  • Idaho scores 95.3 on the MFG Calcs State Cost-to-Manufacture Index, where the U.S. is 100: the 11th lowest of 51 (electricity averaged over the 12 months to Aug 2026, wages from the 2025 survey).
  • Its labor factor (manufacturing wages) is 95.9 and its energy factor (industrial electricity) 88.0; the index weighs wages at 92% and electricity at 8%, their shares of what manufacturers spend on labor and purchased energy, and leaves out taxes, land and incentives.

What factory labor pays in Idaho

  • Industrial production managers: $51.61/hr median in Idaho versus $60.61 nationally (OEWS 2025).
  • Industrial engineers: $48.48/hr median in Idaho versus $49.25 nationally (OEWS 2025).
  • Production supervisors: $34.08/hr median in Idaho versus $35.79 nationally (OEWS 2025).
  • Industrial machinery mechanics: $30.22/hr median in Idaho versus $31.02 nationally (OEWS 2025).
  • Machinists: $28.28/hr median in Idaho versus $28.24 nationally (OEWS 2025).
  • Tool and die makers: $27.79/hr median in Idaho versus $30.79 nationally (OEWS 2025).

Manufacturing jobs in Idaho

  • Idaho had 77,800 manufacturing jobs in Oct 2026, the 36th most of 51 (BLS State and Metro Area Employment, not seasonally adjusted).
  • That is up 2.2% from Oct 2025.

Manufacturing base in Idaho

  • Idaho has 2,114 manufacturing establishments employing about 68,249 workers (Census County Business Patterns, 2023).
  • Average pay per manufacturing employee is $69,546, 5% below the U.S. average of $73,202.
  • Largest sectors by establishment count: fabricated metal products (432), food manufacturing (283), wood product manufacturing (211), machinery manufacturing (141), machine shops (133).

Manufacturing economy in Idaho

  • Manufacturing added $13.3B to Idaho's economy in 2025, 9.7% of the state's GDP, the 36th largest of the 50 states and DC (BEA).

Sources and update cadence

  • Prices come from the U.S. Energy Information Administration, jobs from the Bureau of Labor Statistics, establishments and payroll from the Census Bureau and GDP from the Bureau of Economic Analysis; each refreshes automatically when the agency publishes, and this page archives every month and year it shows so the Idaho history keeps deepening.

Last reviewed 2026-11-20.