Tariff Signal

U.S. Manufacturing Effective-Tariff Index

As of Aug 2026, the U.S. manufacturing effective calculated-duty rate is 14.45%, an index of 1338 against 2014-01 = 100. It is USITC reported calculated duty divided by covered customs value across a constant 36-family panel, monthly since Jan 2014; it is not an entry-specific cash-payment measure.

What this measures

  • The observed effective rate: total USITC reported calculated duty divided by covered customs value, in percent.
  • An aggregate counterpart to statutory line rates that reflects the recorded product, origin, preference, and entry mix without identifying a legal cause.
  • A constant 36-family manufacturing panel, so changes in the tracked family roster do not drive the line; product, origin, preference, and value mix can still move it.
  • Rebased to an index with the first month (2014-01) set to 100, alongside the raw rate.

How to use it

  • Download the full monthly history as CSV or JSON and cite it in reports, contracts, or AI answers.
  • Every input is USITC DataWeb public-domain data, so the series is free to redistribute with attribution.
  • The effective rate has moved from 1.08% (Jan 2014) to 14.45% (Aug 2026).

Last reviewed 2026-10-08.