Tariff monitor
Tariffs by Country
Every reported source country in the tracked manufacturing-family boards, ranked by import value and observed effective calculated-duty rate in one year.
Largest tracked sources
- Mexico: $99.5B of tracked 2025 imports, observed effective calculated-duty rate 4.87%.
- China: $59.6B of tracked 2025 imports, observed effective calculated-duty rate 42.38%.
- Canada: $48.9B of tracked 2025 imports, observed effective calculated-duty rate 5.19%.
- Japan: $43.0B of tracked 2025 imports, observed effective calculated-duty rate 10.43%.
- Germany: $42.0B of tracked 2025 imports, observed effective calculated-duty rate 10.96%.
- Taiwan: $31.2B of tracked 2025 imports, observed effective calculated-duty rate 9.44%.
- South Korea: $30.7B of tracked 2025 imports, observed effective calculated-duty rate 9.94%.
- Malaysia: $17.4B of tracked 2025 imports, observed effective calculated-duty rate 4.84%.
- Vietnam: $16.7B of tracked 2025 imports, observed effective calculated-duty rate 13.26%.
- Italy: $15.5B of tracked 2025 imports, observed effective calculated-duty rate 10.46%.
Highest effective calculated-duty rates among reported sources
- Martinique: 46.79% effective on $9K of 2025 imports (2.11% in the exact prior calendar year).
- Barbados: 45.53% effective on $96K of 2025 imports (0.86% in the exact prior calendar year).
- China: 42.38% effective on $59.6B of 2025 imports (18.12% in the exact prior calendar year).
- Belarus: 41.57% effective on $786K of 2025 imports (24.27% in the exact prior calendar year).
- Libya: 32.71% effective on $4K of 2025 imports (0% in the exact prior calendar year).
- Moldova: 25.23% effective on $9.9M of 2025 imports (1.8% in the exact prior calendar year).
- Venezuela: 24.17% effective on $39.5M of 2025 imports (3.57% in the exact prior calendar year).
- Azerbaijan: 23.89% effective on $92.2M of 2025 imports (12.12% in the exact prior calendar year).
How to read these numbers
- The board includes every reported source row within the tracked manufacturing families, but still excludes products outside that family universe and is not total bilateral trade.
- Each of the 224 reported source countries has a live page with annual value and rate history, trade-program context, and its family boards.
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-01.