Manufacturing Economy Monitor

Motor Vehicles and Parts Manufacturing

Motor Vehicles and Parts manufacturing produced $185B of value added in 2025. That is 6.3% of all U.S. manufacturing output and 0.6% of GDP, making it the 7th-largest of the 19 manufacturing subsectors the Bureau of Economic Analysis tracks. Output shrank 3.0% year over year. It is classed as durable goods manufacturing; the largest producing state is Michigan ($40.8B in 2025).

Output and growth

  • Value added: $185B in 2025, 6.3% of all U.S. manufacturing and 0.6% of GDP.
  • Year-over-year change: -3% in dollar terms.
  • Classification: durable goods manufacturing (BEA subsector 3361MV).

Top producing states

  • Michigan: $40.8B (2025)
  • Texas: $28.4B (2025)
  • Indiana: $19.9B (2025)

Frequently asked questions

  • How big is motor vehicles and parts manufacturing in the U.S.? Motor Vehicles and Parts manufacturing produced $185B of value added in 2025, or 6.3% of all U.S. manufacturing output and 0.6% of total GDP, per BEA GDP-by-industry data. It ranks 7 of 19 manufacturing subsectors by size.
  • Is motor vehicles and parts manufacturing growing or shrinking? In the latest annual data (2025), motor vehicles and parts value added is down 3.0% year over year in dollar terms. The full quarterly series since 2005 is charted above and updates with each BEA release.
  • Which states produce the most motor vehicles and parts? Michigan leads with $40.8B of motor vehicles and parts GDP in 2025, followed by Texas ($28.4B) and Indiana ($19.9B), per BEA state GDP data.
  • Is motor vehicles and parts a durable or nondurable goods industry? BEA classes motor vehicles and parts manufacturing as durable goods. Durable goods (metals, machinery, electronics, vehicles) are products with a service life of three years or more.

About this data

  • Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.

Last reviewed 2026-10-01.