Manufacturing Economy Monitor
U.S. Manufacturing Industries, Ranked
All 19 manufacturing subsectors ranked by value added, from Chemical Products ($579B) down, with growth, GDP share, and top producing states. Live BEA data.
Durable goods industries
- Computer and Electronic Products: $315B value added (10.8% of manufacturing).
- Machinery: $220B value added (7.5% of manufacturing).
- Other Transportation Equipment: $202B value added (6.9% of manufacturing).
- Fabricated Metal Products: $199B value added (6.8% of manufacturing).
- Motor Vehicles and Parts: $185B value added (6.3% of manufacturing).
- Miscellaneous Manufacturing: $119B value added (4.1% of manufacturing).
- Electrical Equipment and Appliances: $87.1B value added (3% of manufacturing).
- Nonmetallic Mineral Products: $85.1B value added (2.9% of manufacturing).
- Primary Metals: $77.8B value added (2.7% of manufacturing).
- Wood Products: $55.5B value added (1.9% of manufacturing).
- Furniture and Related Products: $35.4B value added (1.2% of manufacturing).
Nondurable goods industries
- Chemical Products: $579B value added (19.8% of manufacturing).
- Food, Beverage, and Tobacco Products: $384B value added (13.1% of manufacturing).
- Petroleum and Coal Products: $148B value added (5.1% of manufacturing).
- Plastics and Rubber Products: $94.1B value added (3.2% of manufacturing).
- Paper Products: $70.9B value added (2.4% of manufacturing).
- Printing and Related Support: $42.5B value added (1.5% of manufacturing).
- Textile Mills and Textile Products: $17.7B value added (0.6% of manufacturing).
- Apparel and Leather Products: $12.2B value added (0.4% of manufacturing).
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-09-30.