Manufacturing Economy Monitor
Plastics and Rubber Products Manufacturing in Colorado
Plastics and Rubber Products manufacturing added $727M of value to Colorado's economy in 2025, up 4.6% year over year. That ranks Colorado 32nd of 50 states and DC for this industry. It is 2.5% of Colorado's manufacturing output. Nationally, plastics and rubber products is a $94.1B industry (the 10th-largest of the 19 manufacturing subsectors), per the U.S. Bureau of Economic Analysis.
Output and rank
- Value added: $727M in 2025, #32 of 50 states and DC for this industry.
- Growth: +4.6% year over year.
- Share of Colorado's manufacturing: 2.5% of the state's total manufacturing value added.
- National context: plastics and rubber products is a $94.1B industry nationally, #10 of the 19 manufacturing subsectors (-1.5% year over year).
- Classification: nondurable goods manufacturing (BEA subsector 326).
Frequently asked questions
- How big is the plastics and rubber products industry in Colorado? Plastics and Rubber Products added $727M of value in Colorado in 2025, ranking the state 32nd of 50 states and DC for this industry, per BEA state GDP-by-industry data.
- Is plastics and rubber products growing in Colorado? Colorado's plastics and rubber products output grew 4.6% year over year to 2025. The chart above traces the full annual series since 1997.
- What share of Colorado's manufacturing is plastics and rubber products? Plastics and Rubber Products is 2.5% of Colorado's total manufacturing value added in 2025, per BEA state GDP-by-industry data.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.