Manufacturing Economy Monitor

Manufacturing GDP by State

All 50 states and DC ranked by manufacturing GDP, led by California ($391B), with each state's share of its economy, growth, and largest industries.

Largest state manufacturing economies

  • California: $391B manufacturing GDP (9.1% of the state economy).
  • Texas: $332B manufacturing GDP (11.3% of the state economy).
  • Illinois: $140B manufacturing GDP (11.3% of the state economy).
  • Ohio: $133B manufacturing GDP (13.6% of the state economy).
  • Indiana: $129B manufacturing GDP (23.8% of the state economy).
  • Michigan: $113B manufacturing GDP (15.4% of the state economy).
  • North Carolina: $112B manufacturing GDP (12.4% of the state economy).
  • Pennsylvania: $107B manufacturing GDP (10.1% of the state economy).
  • Georgia: $87.9B manufacturing GDP (9.4% of the state economy).
  • Florida: $87.4B manufacturing GDP (4.8% of the state economy).

About this data

  • Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.

Last reviewed 2026-10-01.