Manufacturing Economy Monitor
Manufacturing in Georgia
Manufacturing contributed $87.9B to Georgia's economy in 2025 (9.4% of the state's GDP), ranking Georgia #9 of 50 states and DC by manufacturing output, per the Bureau of Economic Analysis. Output rose 1.4% year over year (+1.1% after inflation). The state's largest manufacturing industry is food, beverage, and tobacco products ($18.0B in 2025).
Output and rank
- Manufacturing GDP: $87.9B in 2025, #9 of 50 states and DC.
- Share of the state economy: 9.4% of Georgia's GDP.
- Growth: +1.4% year over year (+1.1% after inflation).
- Composition: $46.6B durable goods, $41.2B nondurable goods.
Largest manufacturing industries in Georgia
- Food, Beverage, and Tobacco Products: $18.0B (2025)
- Other Transportation Equipment: $9.1B (2025)
- Chemical Products: $7.3B (2025)
Frequently asked questions
- How big is manufacturing in Georgia? Manufacturing contributed $87.9B to Georgia's economy in 2025, ranking #9 of 50 states and DC, per BEA state GDP data.
- What share of Georgia's economy is manufacturing? Manufacturing is 9.4% of Georgia's GDP in 2025. Nationally, manufacturing averages 9.5% of GDP, so Georgia is less manufacturing-intensive than the national average.
- What is the largest manufacturing industry in Georgia? Food, Beverage, and Tobacco Products leads at $18.0B (2025), followed by other transportation equipment ($9.1B) and chemical products ($7.3B), per BEA state GDP by industry.
- Is manufacturing in Georgia growing? Georgia's manufacturing GDP is up 1.4% year over year in dollar terms and up 1.1% after inflation, per the latest BEA annual data (2025).
- Does Georgia make more durable or nondurable goods? Durable goods lead in Georgia: $46.6B versus $41.2B of value added in 2025.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.