Manufacturing Economy Monitor
Petroleum and Coal Products Manufacturing in Maine
Petroleum and Coal Products manufacturing added $129M of value to Maine's economy in 2025, down 14.1% year over year. That ranks Maine 44th of 50 states and DC for this industry. It is 1.6% of Maine's manufacturing output. Nationally, petroleum and coal products is a $148B industry (the 8th-largest of the 19 manufacturing subsectors), per the U.S. Bureau of Economic Analysis.
Output and rank
- Value added: $129M in 2025, #44 of 50 states and DC for this industry.
- Growth: -14.1% year over year.
- Share of Maine's manufacturing: 1.6% of the state's total manufacturing value added.
- National context: petroleum and coal products is a $148B industry nationally, #8 of the 19 manufacturing subsectors (-15.3% year over year).
- Classification: nondurable goods manufacturing (BEA subsector 324).
Frequently asked questions
- How big is the petroleum and coal products industry in Maine? Petroleum and Coal Products added $129M of value in Maine in 2025, ranking the state 44th of 50 states and DC for this industry, per BEA state GDP-by-industry data.
- Is petroleum and coal products growing in Maine? Maine's petroleum and coal products output shrank 14.1% year over year to 2025. The chart above traces the full annual series since 1997.
- What share of Maine's manufacturing is petroleum and coal products? Petroleum and Coal Products is 1.6% of Maine's total manufacturing value added in 2025, per BEA state GDP-by-industry data.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.