Manufacturing Economy Monitor
Miscellaneous Manufacturing Manufacturing in Nevada
Miscellaneous Manufacturing manufacturing added $3.2B of value to Nevada's economy in 2025, up 7.2% year over year. That ranks Nevada 12th of 50 states and DC for this industry. It is 26.4% of Nevada's manufacturing output. Nationally, miscellaneous manufacturing is a $119B industry (the 9th-largest of the 19 manufacturing subsectors), per the U.S. Bureau of Economic Analysis.
Output and rank
- Value added: $3.2B in 2025, #12 of 50 states and DC for this industry.
- Growth: +7.2% year over year.
- Share of Nevada's manufacturing: 26.4% of the state's total manufacturing value added.
- National context: miscellaneous manufacturing is a $119B industry nationally, #9 of the 19 manufacturing subsectors (+1.7% year over year).
- Classification: durable goods manufacturing (BEA subsector 339).
Frequently asked questions
- How big is the miscellaneous manufacturing industry in Nevada? Miscellaneous Manufacturing added $3.2B of value in Nevada in 2025, ranking the state 12th of 50 states and DC for this industry, per BEA state GDP-by-industry data.
- Is miscellaneous manufacturing growing in Nevada? Nevada's miscellaneous manufacturing output grew 7.2% year over year to 2025. The chart above traces the full annual series since 1997.
- What share of Nevada's manufacturing is miscellaneous manufacturing? Miscellaneous Manufacturing is 26.4% of Nevada's total manufacturing value added in 2025, per BEA state GDP-by-industry data.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.