Manufacturing Economy Monitor
Electrical Equipment and Appliances Manufacturing in Rhode Island
Electrical Equipment and Appliances manufacturing added $154M of value to Rhode Island's economy in 2025, down 1.9% year over year. That ranks Rhode Island 40th of 50 states and DC for this industry. It is 2.5% of Rhode Island's manufacturing output. Nationally, electrical equipment and appliances is a $87.1B industry (the 11th-largest of the 19 manufacturing subsectors), per the U.S. Bureau of Economic Analysis.
Output and rank
- Value added: $154M in 2025, #40 of 50 states and DC for this industry.
- Growth: -1.9% year over year.
- Share of Rhode Island's manufacturing: 2.5% of the state's total manufacturing value added.
- National context: electrical equipment and appliances is a $87.1B industry nationally, #11 of the 19 manufacturing subsectors (+5.8% year over year).
- Classification: durable goods manufacturing (BEA subsector 335).
Frequently asked questions
- How big is the electrical equipment and appliances industry in Rhode Island? Electrical Equipment and Appliances added $154M of value in Rhode Island in 2025, ranking the state 40th of 50 states and DC for this industry, per BEA state GDP-by-industry data.
- Is electrical equipment and appliances growing in Rhode Island? Rhode Island's electrical equipment and appliances output shrank 1.9% year over year to 2025. The chart above traces the full annual series since 1997.
- What share of Rhode Island's manufacturing is electrical equipment and appliances? Electrical Equipment and Appliances is 2.5% of Rhode Island's total manufacturing value added in 2025, per BEA state GDP-by-industry data.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.