Manufacturing Economy Monitor
Plastics and Rubber Products Manufacturing in Washington
Plastics and Rubber Products manufacturing added $751M of value to Washington's economy in 2025, down 5.4% year over year. That ranks Washington 31st of 50 states and DC for this industry. It is 1.2% of Washington's manufacturing output. Nationally, plastics and rubber products is a $94.1B industry (the 10th-largest of the 19 manufacturing subsectors), per the U.S. Bureau of Economic Analysis.
Output and rank
- Value added: $751M in 2025, #31 of 50 states and DC for this industry.
- Growth: -5.4% year over year.
- Share of Washington's manufacturing: 1.2% of the state's total manufacturing value added.
- National context: plastics and rubber products is a $94.1B industry nationally, #10 of the 19 manufacturing subsectors (-1.5% year over year).
- Classification: nondurable goods manufacturing (BEA subsector 326).
Frequently asked questions
- How big is the plastics and rubber products industry in Washington? Plastics and Rubber Products added $751M of value in Washington in 2025, ranking the state 31st of 50 states and DC for this industry, per BEA state GDP-by-industry data.
- Is plastics and rubber products growing in Washington? Washington's plastics and rubber products output shrank 5.4% year over year to 2025. The chart above traces the full annual series since 1997.
- What share of Washington's manufacturing is plastics and rubber products? Plastics and Rubber Products is 1.2% of Washington's total manufacturing value added in 2025, per BEA state GDP-by-industry data.
About this data
- Source: U.S. Bureau of Economic Analysis (public domain). National quarterly values are seasonally adjusted annual rates. Corporate-profit industry detail reflects inventory valuation adjustment without capital consumption adjustment, per NIPA table 6.16D conventions.
Last reviewed 2026-10-01.