HTS Heading 0103

Live swine

All 7 HTS codes under heading 0103 (live swine), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 0103

  • 0103 Live swine.
  • 0103.10.00.00 Purebred breeding animals (under: Live swine) (No.): General Free; Special none; Column 2 Free.
  • 0103.91.00 Weighing less than 50 kg each: General Free; Special none; Column 2 4.4¢/kg.
  • 0103.91.00.10 Weighing less than 7 kg each (under: Weighing less than 50 kg each) (No., kg).
  • 0103.91.00.20 Weighing 7 kg or more but less than 23 kg each (No., kg).
  • 0103.91.00.30 Weighing 23 kg or more but less than 50 kg each (No., kg).
  • 0103.92.00 Weighing 50 kg or more each (under: Other): General Free; Special none; Column 2 4.4¢/kg.
  • 0103.92.00.10 Imported for immediate slaughter (No., kg).
  • 0103.92.00.20 Breeding animals other than purebred breeding animals (No., kg).
  • 0103.92.00.91 Other (under: Weighing 50 kg or more each) (No., kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.