HTS Heading 0104

Live sheep and goats

All 2 HTS codes under heading 0104 (live sheep and goats), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.

Every line of heading 0104

  • 0104 Live sheep and goats.
  • 0104.10.00.00 Sheep (under: Live sheep and goats) (No., kg): General Free; Special none; Column 2 $3/head.
  • 0104.20.00.00 Goats (under: Live sheep and goats) (No.): General 68¢/head; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 $3/head.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.