HTS Chapter 1
Live animals
The 6 headings and 78 HTS codes of chapter 1 (live animals), with their duty rates from the 2026 HTS Revision 23.
The 6 headings of chapter 1
- 0101: Live horses, asses, mules and hinnies (7 codes, General duty Free to 6.8%)
- 0102: Live bovine animals (35 codes, General duty Free, some per unit)
- 0103: Live swine (7 codes, General duty Free)
- 0104: Live sheep and goats (2 codes, General duty Free, some per unit)
- 0105: Live poultry of the following kinds: Chickens, ducks, geese, turkeys and guineas (9 codes, General duty Free, some per unit)
- 0106: Other live animals (18 codes, General duty Free to 4.8%)
Where it sits in the schedule
Chapter 1 is in Section I of the Harmonized System, live animals and animal products (chapters 1 to 5). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.