HTS Heading 0203
Meat of swine, fresh, chilled, or frozen
All 14 HTS codes under heading 0203 (meat of swine, fresh), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.
Every line of heading 0203
- 0203 Meat of swine, fresh, chilled, or frozen.
- 0203.11.00.00 Carcasses and half-carcasses (under: Fresh or chilled) (kg): General Free; Special none; Column 2 5.5¢/kg.
- 0203.12 Hams, shoulders and cuts thereof, with bone in.
- 0203.12.10 Processed (under: Hams, shoulders and cuts thereof, with bone in): General 1.4¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 7.2¢/kg.
- 0203.12.10.10 Hams and cuts thereof (under: Processed) (kg).
- 0203.12.10.20 Shoulders and cuts thereof (under: Processed) (kg).
- 0203.12.90 Other (under: Hams, shoulders and cuts thereof, with bone in): General Free; Special none; Column 2 5.5¢/kg.
- 0203.12.90.10 Hams and cuts thereof (under: Other) (kg).
- 0203.12.90.20 Shoulders and cuts thereof (under: Other) (kg).
- 0203.19 Other (under: Fresh or chilled).
- 0203.19.20 Processed (under: Other): General 1.4¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 7.2¢/kg.
- 0203.19.20.10 Spare ribs (under: Processed) (kg).
- 0203.19.20.90 Other (under: Processed) (kg).
- 0203.19.40 Other (under: Other): General Free; Special none; Column 2 5.5¢/kg.
- 0203.19.40.10 Bellies (under: Other) (kg).
- 0203.19.40.90 Other (under: Other) (kg).
- 0203.21.00.00 Carcasses and half-carcasses (under: Frozen) (kg): General Free; Special none; Column 2 5.5¢/kg.
- 0203.22 Hams, shoulders and cuts thereof, with bone in.
- 0203.22.10.00 Processed (under: Hams, shoulders and cuts thereof, with bone in) (kg): General 1.4¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7.2¢/kg.
- 0203.22.90.00 Other (under: Hams, shoulders and cuts thereof, with bone in) (kg): General Free; Special none; Column 2 5.5¢/kg.
- 0203.29 Other (under: Frozen).
- 0203.29.20.00 Processed (under: Other) (kg): General 1.4¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7.2¢/kg.
- 0203.29.40.00 Other (under: Other) (kg): General Free; Special none; Column 2 5.5¢/kg.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.