HTS Heading 0208
Other meat and edible meat offal, fresh, chilled or frozen
All 9 HTS codes under heading 0208 (other meat), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.4%, some per unit.
Every line of heading 0208
- 0208 Other meat and edible meat offal, fresh, chilled or frozen.
- 0208.10.00.00 Of rabbits or hares (under: Other meat and edible meat offal, fresh, chilled or frozen) (kg): General 6.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 0208.30.00.00 Of primates (under: Other meat and edible meat offal, fresh, chilled or frozen) (kg): General 6.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 0208.40.01.00 Of whales, dolphins and porpoises (mammals of the order Cetacea); of manatees and dugongs (mammals of the order Sirenia); of seals, sea lions and walruses (mammals of the suborder Pinnipedia). (kg): General 6.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 0208.50.00.00 Of reptiles (including snakes and turtles) (kg): General 6.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 0208.60.00.00 Of camels and other camelids (Camelidae) (kg): General 6.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 0208.90 Other (under: Other meat and edible meat offal, fresh, chilled or frozen).
- 0208.90.20.00 Deer (under: Other) (kg): General Free; Special none; Column 2 13.2¢/kg.
- 0208.90.25.00 Frogsʼ legs (under: Other) (kg): General Free; Special none; Column 2 10%.
- 0208.90.30.00 Quail, eviscerated, not in pieces (kg): General 7¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 22¢/kg.
- 0208.90.91.00 Other (under: Other) (kg): General 6.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.