HTS Heading 0210

Meat and edible meat offal, salted, in brine, dried or smoked; edible flours and meals of meat or meat offal

All 12 HTS codes under heading 0210 (meat and edible meat), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.3%, some per unit.

Every line of heading 0210

  • 0210 Meat and edible meat offal, salted, in brine, dried or smoked; edible flours and meals of meat or meat offal.
  • 0210.11.00 Hams, shoulders and cuts thereof, with bone in: General 1.4¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 7.2¢/kg.
  • 0210.11.00.10 Hams and cuts thereof (under: Hams, shoulders and cuts thereof, with bone in) (kg).
  • 0210.11.00.20 Shoulders and cuts thereof (under: Hams, shoulders and cuts thereof, with bone in) (kg).
  • 0210.12.00 Bellies (streaky) and cuts thereof: General 1.4¢/kg; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7.2¢/kg.
  • 0210.12.00.20 Bacon (under: Bellies (streaky) and cuts thereof) (kg).
  • 0210.12.00.40 Other (under: Bellies (streaky) and cuts thereof) (kg).
  • 0210.19.00 Other (under: Meat of swine): General 1.4¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 7.2¢/kg.
  • 0210.19.00.10 Canadian style bacon (under: Other) (kg).
  • 0210.19.00.90 Other (under: Other) (kg).
  • 0210.20.00.00 Meat of bovine animals (under: Meat and edible meat offal, salted, in brine, dried or smoked; edible flours and meals of meat or meat offal) (kg): General Free; Special none; Column 2 30%.
  • 0210.91.00.00 Of primates (under: Other, including edible flours and meals of meat or meat offal) (kg): General 2.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 0210.92.01.00 Of whales, dolphins and porpoises (mammals of the order Cetacea); of manatees and dugongs (mammals of the order Sirenia); of seals, sea lions and walruses (mammals of the suborder Pinnipedia) (kg): General 2.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 0210.93.00.00 Of reptiles (including snakes and turtles) (kg): General 2.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 0210.99 Other (under: Other, including edible flours and meals of meat or meat offal).
  • 0210.99.20.00 Meat of poultry of heading 0105 (kg): General 2.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 0210.99.91.00 Other (under: Other) (kg): General 2.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.