HTS Heading 0407

Birds' eggs, in shell, fresh, preserved or cooked

All 6 HTS codes under heading 0407 (birds' eggs, in shell, fresh), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.

Every line of heading 0407

  • 0407 Birds' eggs, in shell, fresh, preserved or cooked.
  • 0407.11.00.00 Of fowls of the species Gallus domesticus (doz.): General 2.8¢/doz.; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10¢/doz..
  • 0407.19.00.00 Other (under: Fertilized eggs for incubation) (doz.): General 2.8¢/doz.; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10¢/doz..
  • 0407.21.00 Of fowls of the species Gallus domesticus: General 2.8¢/doz.; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10¢/doz..
  • 0407.21.00.30 Fresh table eggs (consumer grades) (doz.).
  • 0407.21.00.90 Other (under: Of fowls of the species Gallus domesticus) (doz.).
  • 0407.29.00.00 Other (under: Other fresh eggs) (doz.): General 2.8¢/doz.; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10¢/doz..
  • 0407.90.00.00 Other (under: Birds' eggs, in shell, fresh, preserved or cooked) (doz.): General 2.8¢/doz.; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10¢/doz..

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.