HTS Heading 0408

Birds' eggs, not in shell, and egg yolks, fresh, dried, cooked by steaming or by boiling in water, molded, frozen or otherwise preserved, whether or not containing added sugar or other sweetening matter

All 4 HTS codes under heading 0408 (birds' eggs), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.

Every line of heading 0408

  • 0408 Birds' eggs, not in shell, and egg yolks, fresh, dried, cooked by steaming or by boiling in water, molded, frozen or otherwise preserved, whether or not containing added sugar or other sweetening matter.
  • 0408.11.00.00 Dried (under: Egg yolks) (kg): General 47.6¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 59.5¢/kg.
  • 0408.19.00.00 Other (under: Egg yolks) (kg): General 9.7¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 24.3¢/kg.
  • 0408.91.00.00 Dried (under: Other) (kg): General 47.6¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 59.5¢/kg.
  • 0408.99.00.00 Other (under: Other) (kg): General 9.7¢/kg; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 24.3¢/kg.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.