HTS Heading 0507
Ivory, tortoise-shell, whalebone and whalebone hair, horns, antlers, hooves, nails, claws and beaks, unworked or simply prepared but not cut to shape; powder and waste of these products
All 3 HTS codes under heading 0507 (ivory, tortoise-shell), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 0507
- 0507 Ivory, tortoise-shell, whalebone and whalebone hair, horns, antlers, hooves, nails, claws and beaks, unworked or simply prepared but not cut to shape; powder and waste of these products.
- 0507.10.00.00 Ivory; ivory powder and waste (kg): General Free; Special none; Column 2 Free.
- 0507.90.00 Other (under: Ivory, tortoise-shell, whalebone and whalebone hair, horns, antlers, hooves, nails, claws and beaks, unworked or simply prepared but not cut to shape; powder and waste of these products): General Free; Special none; Column 2 Free.
- 0507.90.00.10 Velvet antler (under: Other) (kg).
- 0507.90.00.90 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.