HTS Heading 0506

Bones and horn-cores, unworked, defatted, simply prepared (but not cut to shape), treated with acid or degelatinized; powder and waste of these products

All 3 HTS codes under heading 0506 (bones and horn-cores, unworked, defatted), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 0506

  • 0506 Bones and horn-cores, unworked, defatted, simply prepared (but not cut to shape), treated with acid or degelatinized; powder and waste of these products.
  • 0506.10.00.00 Ossein and bones treated with acid (kg): General Free; Special none; Column 2 Free.
  • 0506.90.00 Other (under: Bones and horn-cores, unworked, defatted, simply prepared (but not cut to shape), treated with acid or degelatinized; powder and waste of these products): General Free; Special none; Column 2 Free.
  • 0506.90.00.20 Bones, crude, steamed or ground (kg).
  • 0506.90.00.40 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.