HTS Chapter 5

Products of animal origin, not elsewhere specified or included

The 9 headings and 38 HTS codes of chapter 5 (other animal products), with their duty rates from the 2026 HTS Revision 23.

The 9 headings of chapter 5

Where it sits in the schedule

Chapter 5 is in Section I of the Harmonized System, live animals and animal products (chapters 1 to 5). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.

Last reviewed 2026-11-12.