HTS Heading 0510
Ambergris, castoreum, civet and musk; cantharides; bile, whether or not dried; glands and other animal products used in the preparation of pharmaceutical products, fresh, chilled, frozen or otherwise provisionally preserved
All 4 HTS codes under heading 0510 (ambergris, castoreum, civet and musk), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.1%.
Every line of heading 0510
- 0510.00 Ambergris, castoreum, civet and musk; cantharides; bile, whether or not dried; glands and other animal products used in the preparation of pharmaceutical products, fresh, chilled, frozen or otherwise provisionally preserved.
- 0510.00.20.00 Ambergris, castoreum, civet and musk (kg): General 5.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 0510.00.40 Other (under: Ambergris, castoreum, civet and musk; cantharides; bile, whether or not dried; glands and other animal products used in the preparation of pharmaceutical products, fresh, chilled, frozen or otherwise provisionally preserved): General Free; Special none; Column 2 Free.
- 0510.00.40.10 Pancreas glands (under: Other) (kg).
- 0510.00.40.20 Bile and other animal secretions (kg).
- 0510.00.40.40 Cantharides; glands (other than pancreas), organs and other animal products used in the preparation of pharmaceutical products (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.