HTS Heading 0511

Animal products not elsewhere specified or included; dead animals of chapter 1 or 3, unfit for human consumption

All 14 HTS codes under heading 0511 (animal products not elsewhere specified), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3%.

Every line of heading 0511

  • 0511 Animal products not elsewhere specified or included; dead animals of chapter 1 or 3, unfit for human consumption.
  • 0511.10.00 Bovine semen (under: Animal products not elsewhere specified or included; dead animals of chapter 1 or 3, unfit for human consumption): General Free; Special none; Column 2 10%.
  • 0511.10.00.10 Dairy (under: Bovine semen) (doses).
  • 0511.10.00.90 Other (under: Bovine semen) (doses).
  • 0511.91.00 Products of fish or crustaceans, molluscs or other aquatic invertebrates; dead animals of chapter 3: General Free; Special none; Column 2 Free.
  • 0511.91.00.10 Fertilized fish eggs (under: Products of fish or crustaceans, molluscs or other aquatic invertebrates; dead animals of chapter 3) (kg).
  • 0511.91.00.90 Other (under: Products of fish or crustaceans, molluscs or other aquatic invertebrates; dead animals of chapter 3) (kg).
  • 0511.99 Other (under: Other).
  • 0511.99.20.00 Parings and similar waste of raw hides or skins; glue stock not elsewhere specified or included (kg): General Free; Special none; Column 2 Free.
  • 0511.99.30 Products chiefly used as food for animals or as ingredients in such food: General Free; Special none; Column 2 10%.
  • 0511.99.30.30 Antarctic krill ( Euphausia superba) (kg).
  • 0511.99.30.60 Other (under: Products chiefly used as food for animals or as ingredients in such food) (kg).
  • 0511.99.33.00 Horsehair and horsehair waste, whether or not put up as a layer with or without supporting material (kg): General Free; Special none; Column 2 Free.
  • 0511.99.36.00 Natural sponges of animal origin (kg): General 3%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 15%.
  • 0511.99.40 Other (under: Other): General 1.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 0511.99.40.24 Dairy cattle (under: Cattle embryos) (No.).
  • 0511.99.40.28 Other cattle (under: Cattle embryos) (No.).
  • 0511.99.40.30 Dried blood (under: Other) (kg).
  • 0511.99.40.40 Other animal semen (under: Other) (doses).
  • 0511.99.40.70 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.