HTS Heading 0601

Bulbs, tubers, tuberous roots, corms, crowns and rhizomes, dormant, in growth or in flower; chicory plants and roots other than roots of heading 1212

All 12 HTS codes under heading 0601 (bulbs, tubers), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.5%, some per unit.

Every line of heading 0601

  • 0601 Bulbs, tubers, tuberous roots, corms, crowns and rhizomes, dormant, in growth or in flower; chicory plants and roots other than roots of heading 1212.
  • 0601.10 Bulbs, tubers, tuberous roots, corms, crowns and rhizomes, dormant.
  • 0601.10.15.00 Tulip bulbs (under: Bulbs, tubers, tuberous roots, corms, crowns and rhizomes, dormant) (No.): General 89.6¢/1000; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $6/1000.
  • 0601.10.30.00 Hyacinth bulbs (under: Bulbs, tubers, tuberous roots, corms, crowns and rhizomes, dormant) (No.): General 38.4¢/1000; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 $4/1000.
  • 0601.10.45.00 Lily bulbs (under: Bulbs, tubers, tuberous roots, corms, crowns and rhizomes, dormant) (No.): General 55.7¢/1000; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $6/1000.
  • 0601.10.60.00 Narcissus bulbs (under: Bulbs, tubers, tuberous roots, corms, crowns and rhizomes, dormant) (No.): General $1.34/1000; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $6/1000.
  • 0601.10.75.00 Crocus corms (under: Bulbs, tubers, tuberous roots, corms, crowns and rhizomes, dormant) (No.): General 19.2¢/1000; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 $2/1000.
  • 0601.10.85.00 Lily of the valley pips (under: Bulbs, tubers, tuberous roots, corms, crowns and rhizomes, dormant) (No.): General $1.44/1000; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 $6/1000.
  • 0601.10.90 Other (under: Bulbs, tubers, tuberous roots, corms, crowns and rhizomes, dormant): General 3.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 0601.10.90.20 Iris bulbs (under: Other) (No.).
  • 0601.10.90.40 Gladiolus corms (under: Other) (No.).
  • 0601.10.90.60 Begonia (tuberous) tubers (under: Other) (No.).
  • 0601.10.90.80 Other (under: Other) (No.).
  • 0601.20 Bulbs, tubers, tuberous roots, corms, crowns and rhizomes, in growth or in flower; chicory plants and roots.
  • 0601.20.10.00 Hyacinth bulbs, without soil attached (No.): General 38.4¢/1000; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 $4/1000.
  • 0601.20.90.00 Other (under: Bulbs, tubers, tuberous roots, corms, crowns and rhizomes, in growth or in flower; chicory plants and roots) (No.): General 1.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.