HTS Heading 0602
Other live plants (including their roots), cuttings and slips; mushroom spawn
All 14 HTS codes under heading 0602 (other live plants), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.8%, some per unit.
Every line of heading 0602
- 0602 Other live plants (including their roots), cuttings and slips; mushroom spawn.
- 0602.10.00.00 Unrooted cuttings and slips (under: Other live plants (including their roots), cuttings and slips; mushroom spawn) (No.): General 4.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 0602.20.00.00 Trees, shrubs and bushes, grafted or not, of kinds which bear edible fruit or nuts (No.): General Free; Special none; Column 2 25%.
- 0602.30.00.00 Rhododendrons and azaleas, grafted or not (No.): General 1.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 0602.40.00.00 Roses, grafted or not (under: Other live plants (including their roots), cuttings and slips; mushroom spawn) (No.): General Free; Special none; Column 2 4¢ each.
- 0602.90 Other (under: Other live plants (including their roots), cuttings and slips; mushroom spawn).
- 0602.90.20.00 Orchid plants (under: Herbaceous perennials) (kg): General Free; Special none; Column 2 25%.
- 0602.90.30 With soil attached to roots (under: Other): General 1.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 0602.90.30.10 Chrysanthemums (under: With soil attached to roots) (No.).
- 0602.90.30.90 Other (under: With soil attached to roots) (No.).
- 0602.90.40.00 Other (under: Other) (kg): General 3.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 0602.90.50.00 Mushroom spawn (under: Other) (kg): General 1.4¢/kg; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S, SG); Column 2 2.2¢/kg.
- 0602.90.60 With soil attached to roots (under: Other): General 1.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 0602.90.60.10 Trees and shrubs (under: With soil attached to roots) (No.).
- 0602.90.60.20 Poinsettias (under: With soil attached to roots) (No.).
- 0602.90.60.90 Other (under: With soil attached to roots) (No.).
- 0602.90.90 Other (under: Other): General 4.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 0602.90.90.10 Trees and shrubs (under: Other) (No.).
- 0602.90.90.90 Other (under: Other) (No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.